My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-2025 - Agenda Packet Cc - Regular Meeting
Orono
>
City Council
>
2025
>
11-24-2025 - Agenda Packet Cc - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2025 3:29:23 PM
Creation date
11/24/2025 3:12:08 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Regular Meeting
Document Date
11/24/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: November 24, 2025 <br />Title: Fox Street Sewer Main Extension (24-044) - Acceptance <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: Consent Agenda <br />Purpose: <br />The purpose of this action item is to accept the Fox Street Sewer Extension. <br />Item: 8 <br />2. Background: <br />The property owners at 3400 and 3350 Fox Street have requested sewer service be extended to <br />service the properties. The properties are in the Metropolitan Urban Service Area (MUSA). The <br />nearest city sewer main is a gravity main manhole near the corner of Bayside Road and Leaf <br />Street. There are a total of 11 parcels along the route of the new main and within the MUSA that <br />could potential connect to the main in the future. The property owners have requested to install a <br />low-pressure force main to connect their neighborhood to the city collection system. The owners <br />hired an engineering firm to prepare plans for the sewer main and will hire a contractor for the <br />installation of the main. The City approved the construction of the sewer main and entered into an <br />agreement with the property owners for its construction in October of 2024. Construction is now <br />complete. <br />3. Cost: <br />The costs associated with the construction of the sewer mains was paid by the residents. Upon <br />completion and acceptance by the city, ongoing maintenance of the sewer will be the City's <br />responsibility. <br />4. Staff Recommendation: <br />The sewer main has been constructed and inspected by the utility staff. It is ready to be placed <br />into service. I recommend acceptance of the sewer into the city system. <br />COUNCIL ACTION REQUESTED <br />Motion to accept the sewer main improvement. <br />Exhibits <br />A. Fox Street Forcemain As -built <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.