My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4645 Bayside Road - 06-117-23-22-0009
>
Land Use
>
13-3591, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 1:41:14 PM
Creation date
11/20/2025 1:38:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC ExhibitW <br />Outlot C, Bayview Farms znd Addition <br />#13-3591 <br />Summary Estimate of Fees* <br />Preliminary Subdivision Plat Application: <br />Preliminary Subdivision Application <br />Proposed Private Road <br />Proposed On-Site Evaluation -review charges <br />Application Escrow {guarantees payment of City's consultant costs) <br />Estimated cost of City Engineer's review of preliminary plat <br />{Actual cost will be billed to property owner) <br />Collected with Application <br />Final Subdivision Plat Application: <br />Final Subdivision Application, including Legal Review and Filing <br />{w/ covenants) {Covers first review of documents, if additional time is <br />required, those costs will be billed to the property owner.) <br />Storm Water and Drainage Trunk Fee <br />{paid for the entire plat) <br />Park Fee {8% of Fair Market Value), but no less than <br />$850 +$30/lot <br />$650 + $0.50/lineal foot <br />$60 per proposed lot <br />$10,000 <br />$7,500 <br />$2,484.00 + $10,000 escrow <br />$700 <br />$3,840/acre ** <br />$3,250/per lot and no more than $5,550 per lot x #of new lots $5,550/lot <br />Estimated cost of City Engineer's review of final plat <br />{Actual cost will be billed to property owner) <br />$500.00 <br />Final Subdivision Application Fee is paid with the Final Plat application. Storm Water and Drainage Trunk Fee, <br />Park Fee and consultant costs are paid before the final plat is recorded. <br />*Based on 2013 Fee Schedule <br />** Maximum Fee : For the 2-acre zoning districts, any lot exceeding 4.0 gross acres including wet <br />land, shall be charged a maximum trunk fee equal to the trunk fee for a 4.0 acre parcel.
The URL can be used to link to this page
Your browser does not support the video tag.