Laserfiche WebLink
0 <br />®� �O CITY of ORONO <br />AV RESOLUTION OF THE CITY COUNCIL <br />NO. <br />ESKOQ"� <br />CONCLUSIONS, ORDER AND CONDITIONS <br />NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of the <br />findings noted above, the City Council of the City of Orono hereby grants Preliminary Plat <br />Approval for a 5-lot plat per the Preliminary Plat survey/drawing by Sathre-Bergquist, Inc. dated <br />02/15/2013 and attached hereto as Exhibit A, subject to the following conditions: <br />1) The Preliminary Plat approval granted by this Resolution shall expire one year from the <br />approval date (March 11, 2014). <br />2) Approval is subject to Minnehaha Creek Watershed District (MCWD) approval and permits <br />as required. Final plat approval shall not be granted until the Developer has provided <br />evidence that all required MCWD permits have been obtained. <br />3) Approval is subject to Hennepin County approval of the proposed private road location and <br />permits as required. Final plat approval shall not be granted until the Developer has <br />provided evidence that all required Hennepin County permits have been obtained. <br />4) The Developer shall construct the required private road and stormwater management <br />facilities on the Property. <br />5) The Developers shall adhere to their CDMP consisting of the Site Ecological Summary and <br />Project Recommendations regarding Conservation Design requirements by Kjolhaug <br />Environmental Services (KES) dated February 6, 2013 including implementation of the <br />invasive species removal and maintenance provisions of the Bayside Meadows Invasive <br />Species Management Plan dated 02/26/2013 prepared by KES. <br />6) Development Fees. <br />a) Park Dedication Fee, The development is subject to the standard Park Dedication Fee <br />for 5 new lots x $5,550,00 per lot = $27,750. <br />b) Storm Water and Drainage Trunk Fee. The development is subject to the standard <br />Storm Water and Drainage Trunk Fee of $3,840 per acre x 13.72 total acres = <br />$52,684.80*. (*Fee will be determined based on the current Fee Schedule at the time <br />when the final plat application is made.) <br />7) Approval of the Final Plat is subject to compliance with the existing and ongoing <br />recommendations of the City Engineer. <br />8) In order to facilitate preparation of the final documents, as soon as feasible, the Applicant <br />shall submit to the City written legal descriptions for all required easements as noted herein. <br />Page 4 of 8 <br />