Additional permits required: <br />Plumbing <br />Mechanical <br />Electrical <br />Sewer <br />Reviewed for Code Compliance <br />Nicole Post <br />RPS24-000001 <br />2-2-24 <br />Stamped and approved plans <br />must be on site for the <br />duration of the project and all <br />inspections. <br />To schedule inspections call: <br /> 952-249-4613 <br />Please have the permit <br />number and street address <br />ready at time of call. <br />Please plan accordingly. The City will not <br />issue a Temporary Certificate of <br />Occupancy (Temp CO) for new homes <br />during the growing season from May 1st to <br />November 1st. Issuance of a Certificate of <br />Occupancy requires all permits associated <br />with the project to be finaled and an <br />as-built survey approved by the City. If <br />vegetation is not fully established at the <br />time of CO issuance, the erosion control <br />escrow will continue to be held.