My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Brad Van Nest, Mayor <br />City of Orono <br />March 15, 1978 <br />Page Two <br />The CSP indicates that the City will initiate whatever action is <br />necessary to provide adequate intercommunity sewer service in <br />the future. The intercommunity sewer service agreement between <br />your City and the City of Long Lake for the Hackberry Hills states <br />that some action will be required by Orono upon the completion of <br />the Orono -Long Lake Interceptor. We assume that the City of Orono <br />will follow through on any intercommunity sewer needs that are <br />necessary even though the interceptor (as a forcemain) will have a <br />different location than the previously proposed gravity sewer. Since <br />this action may require the installation of a local sewer within a <br />five year period, the CSP should be revised to include a description <br />and tentative time schedule for this improvement. <br />In response to your statements regarding the design of the Orono - <br />Long Lake Interceptor, we again state that the design parameters <br />(population served and time period) are as confirmed in our letter of <br />March 1, 1978. These design parameters are in accordance with the <br />existing and projected sewerage needs of the area. It is the <br />responsibility -of the Commission to provide facilities in accordance <br />with local and metropolitan planning and determine a prudent design <br />life for the facility which is acceptable to the Minnesota Pollution <br />Control Agency and the Environmental Protection Agency. The Commission <br />believes that it has carried out its responsibility for the proper <br />design of this metropolitan interceptor. <br />Very truly yours, <br />Bernard a ringto <br />Directo f Engineering <br />BJH:RAO:bdw <br />cc: Metropolitan Council <br />Minnesota Pollution Control Agency <br />City of Long Lake <br />R. J. Dougherty, MWCC <br />0", <br />
The URL can be used to link to this page
Your browser does not support the video tag.