My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Representative Robert L. Searles <br />February 6, 1978 <br />Page 2 <br />Before the City can endorse the Orono -Long Lake interceptor as <br />presently designed, the following question- must be answered by <br />the ?Metropolitan Council and Metropolitan 17aste Control Commission <br />in a method that the City can rely on: <br />Can Orono, in restating its Comprehensive Land Use Plan, <br />locate the MUSA line in such a way that the unseiaered portion <br />of the City will be in the rural service area, even though <br />the proposed Orono -Long Lake interceptor pipe itself, may <br />have additional hydraulic capicity beyond the pumping stations <br />presently designed to serve only that portion of Orono which <br />will lie within the urban service area and which is presently <br />sewered? <br />As you know, Bob, the City submitted its Comprehensive Sewer Plan <br />in October of 1976 and .negotiated'with the Metropolitan Council <br />until finally reaching an agreement in March of 1977, which resultec <br />in an acceptable Systems Statement and staff recommendation of the <br />Comprehensive Sewer Plan in June of 1977. Since that time, the <br />City has received no assurances from the Metropolitan Council staff <br />�• that we will be able to locate the MUSA line in accordance with our <br />Comprehensive Plan adopted in 1974. It seems to us that before <br />we go to. any expense of restating our Comprehensive Plan in accordar <br />with the Mandatory Land Planning Act,that our Comprehensive Sewer <br />Plan should be approved and a meaningful answer to the question <br />stated above .should be given by the Metropolitan Council. We feel - <br />strongly that the ground rules should be agreed on before the Orono - <br />Long Lake interceptor is -constructed so that we don't find out <br />that tYie.game is over once the interceptor is constructed and that <br />the fact that the interceptor -is in the ground dictates that all <br />of rural Orono must be in the urban service area of the Metropolitan <br />area. <br />I am enclosing a copy of a revised drawing showing the City's <br />location of the MUSA line as a result of our meeting of last Thursda <br />with Bernie Harrington and (Karl B urandt. <br />Thank you for your cooperation in this matter. <br />Y u s truly <br />Brad Van Nest <br />Orono Mayor <br />Enclosure <br />cc: Otto Bonestroo, City Engineer <br />Jim Olson, City Engineer <br />Jim Daley, Metropolitan Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.