My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;;�Tr��OLITAn <br />_t.:atTE <br />'QCITNOL <br />came, iff ion <br />350 mETROIOURRE BLDG. <br />7TH & ROBERTT REEV <br />/AInT PAUL mn 55101 <br />612 222.8423 <br />November 14, 1977 <br />Mr. Brad Van Nest, Mayor <br />City of Orono <br />3295 Carman Road <br />Excelsior, MN 55331 <br />Subject: Orono -Long Lake Interceptor, MWCC Project No. 71-13 <br />Dear Mayor Van Nest: <br />The Commission currently is in the process of revising Addendum No. 2 <br />to the Preliminary Engineering Report, Orono -Long Lake Interceptor. <br />The revised addendum will show a reduced flow to the Long Lake Lift <br />Station to conform with the Metropolitan Council's direction to exclude <br />Maple Plain, the Independence Beach area of Medina and Morris D. Baker <br />Park Reserve from the designated service area for this facility. We <br />anticipate the revised addendum will be available for distribution in <br />approximately one week. <br />The service area for this facility was defined by the Metropolitan Council <br />in their August 12, 1976 action, approving the Addendum to the Preliminary <br />Engineering Report. This facility will have a design life of 20 years. <br />Therefore, the facility service area contains that land area which could <br />develop, or portions of which may require sewer service between 1990 and <br />2000. <br />The Commission recognizes the local government's responsibility to define <br />an interim sewer service area, applicable until 1990, in a comprehensive <br />sewer plan -prepared in accordance with the Waste Management Policy Plan. <br />This interim sewer service would not necessarily correspond to the <br />facility design service area due to the difference in the time periods. <br />The revised Addendum will be transmitted to you for your <br />as it is completed. 'If you have any further questions, <br />Mr. William Moeller, Staff Engineer, at this office. <br />Very truly yours, <br />a U •ter <br />B. J Harrington <br />Director of Engineering <br />BJH:WPM:hw <br />cc: Richard J. Dougherty, MWCC <br />Lyle Swanson, McCombs -Knutson <br />review as soon <br />please contact <br />
The URL can be used to link to this page
Your browser does not support the video tag.