My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(• <br />SEWAGE FLOW <br />Since the original Addendum to the Preliminary Engineering <br />Report for the Orono -Long Lake Interceptor was written in April <br />of 1976, the Orono Comprehensive Sewer Plan has been completed. <br />This plan has affected the design flows for the Metropolitan <br />Interceptor facilities. <br />Exhibit A is a revision of Table 10 from the Preliminary <br />Report Addendum. Flows from Orono have been revised to reflect <br />less urbanization and sewering as planned. by Orono and shown in <br />their comprehensive sewer plan. The table breaks the flows down <br />by pumping stations to which the flows are contributed. <br />The total average flows for 1995 from the revised table <br />are as follows: <br />Station Average Daily Flow cfs <br />Orono Metro 1.65 <br />Long Lake Metro 1.42 <br />Orono Municipal '09 <br />For the Metropolitan pumping <br />stations, the design <br />flows <br />are <br />as follows: <br />Average Daily Flow <br />Peak Factor <br />Peak <br />Flow <br />Orono' 1.65 cfs 1.07 mgd <br />3.3 <br />2450 <br />gpm <br />Long Lake* 1.42 cf s .92 mgd <br />3.4 <br />2200 <br />gpm <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.