Laserfiche WebLink
METROP0 n <br />WArrE office Memorandum <br />conToesROL - <br />GP� DATE June 16, 1977 <br />TQ; John Bol and, Chairman, Metropolitan Council 3?JDEX <br />Chief Administrator <br />FROM: R. J. Dougherty, N 7 1977 <br />�OUN �Ib <br />Comments on the memorandum to the Physical Development <br />to �E��� � c?�����°�� <br />sUBJECT• C _ <br />Orono Interim Comprehensive Sewer Plan, date E`� <br />co of the subject memorandum was submitted to our staff <br />�n june la, 1977, a Py <br />-for review ew and corgnent. - should be amended <br />SA <br />as is <br />recommended in the subject memorandum thatueten Uthe oundary sho l as indicated <br />as shown on Attachment B to the memorandum. jsmall acreage <br />only the existing area of the City that <br />of existing s11 ac .. As <br />world encompass <br />indicated in the memorandum there are 15 isolate areasMUSA,Ahe von-site disposal <br />Level opment, that would be located of is i nelo000 feetof theshoreline and will l i e <br />s�stens. Seven of these areas are w tor. The location for this interceptor <br />adjacent to the proposed Orono he cons <br />was established to facilitate the construction of future sewers to these areas. <br />•� racticable, the MSSR <br />The !haste Management Policy Plan indicates that as soon as Pof the Urban"Service <br />perimeter should be made consistent with the outer <br />olicoie5d f the Metropolitan Council <br />the existing p <br />"Area. Once this is accomplished, policy of not <br />and Waste Control Commission. indicate that no SAC units shall be to building <br />permits issued.to areas outside of the Sewer utrvic otic <br />MSSR was <br />ed <br />assi7he early <br />Reserve Capacity to areas located outside <br />eiteratedeinathespol y <br />in_the early days of the Waste Control Commission w to deviate from this policy <br />of the SAC method_ ' It is felt_ that it woul d be wrong <br />at this point as proposed: <br />Since this area of Orono is within the sewer service area of our proposed Orono- <br />Interceptor, this area should be eligible for SAC charges to help retire <br />Long Lake P <br />the debt services on this interceptor. <br />as <br />Ii was also <br />indicated in the memorandum that several owithis three yearseafterethef1ec <br />as areas C, D, G and.H will be provided sewer service <br />rs -that <br />reas <br />interceptor is constructed. The Commission concese areas ttosbeashould <br />providedse sewer servic <br />provided sewer'service at an early date. For t the Waste Control Commission Act <br />and thus be billed by the Commission for sewer use, <br />indicates that•these areas must be incltided in the MSSR. s to the MUSA boundar <br />For these reasons, <br />the Commission objects to the proposed change <br />and that the MUSA be established consistbnteial descriptio ervice area <br />for the Orono-Long Lake Interceptor and identifiedy l <br />RJD:DSB:bdw <br />cc- A. C. Gnerre, Deputy Chief Administrator, MWCC <br />Sand Dean •1�x9�o�tan Counc <br />