My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 901
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0900 - 0999 (April 13, 1978 - February 27, 1979)
>
Resolution 901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 10:09:46 AM
Creation date
11/16/2015 10:09:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w1 METROPOLITA.'? CO►S1TC.L <br />'�•.- .• Suite 3CO :Metro Sq -.:are Bui:din;, Saint Paul, N <br />irresota 55101 <br />29i-635? <br />• <br />MEMORANDUM <br />TO: Physical Development Committee <br />FROM: Elaine Stanley, Envi=onmental Planning Staff - <br />.. i- <br />V{L..LhG�s Cil <br />July 27, 1976 <br />SUBJECT: Addendum to the Preliminary Engineering Report for the Orono -Long Lake Interceptor, <br />Project 71-13, Referral File No. 769 <br />Metropolitan Council Districts le and 12 <br />I. Introduction <br />On June 15, 1976, the Metropolitan Waste Control Commission (MWCC) submitted an Addendum. to e <br />Prelimiaary Ea^ineerin^ Report for the Orono -Lona Lake Interce^tor. The recommended project consists <br />" of c fcx2-ai-1`sq-3tem•that will phase out both the Orono and, Long Lake sewage treatment plants and <br />connect to a metropolitan interceptor in Wayzata; sewage will be treated at the MWCC Blue Lake plant. <br />The recommended facility has changed substantially from the one recommended in the onginai report - <br />and the N'WCC has requested Council review -of the change and comment on the status of the Council's <br />approval of the original project concept in relation to the present project concept. This project rias <br />beer. programmed for federal and state grants and so.the lvPCA is also awaiting the Courcil's attic,.. <br />t II. Bac_ kzr_ curd <br />The Orono -Long Lake Interceptor was first initiated -as project 71-13 in the MetopoLtan Sewer Board's <br />1971 Capital Improvement Program and was approved 'in concept by the Metropolitan Council. The pnrci- <br />pal reason for the project was and remains the elimination of effluent dischar,ed to Lake hiin:�etonl:a <br />- by the local sewage treatment plants at Orono and Long Lake. The completion of this project will <br />leave one source discharging to the lake, namely the Maple Plain plant which discharges to Pointers <br />Creek which in turn discharges into Lake Minnetonka In early 1973 the M1NCC completed a <br />engineering report on the capacity,P preliminary <br />type -and route of the interceptor which recommended Alternate 1, <br />a gravity facility having the lowest annual costa Other alternates investigated had lower initial construc- <br />- • tion costs but were all or nearly all forcemain systems and provided for more limited amount of local service <br />" ..�';;.•` than the gravity facility. OnApril:19, 1974, the'Council adopted the following two recon merdations: <br />i. That the Sewer Board construct .an"interceptor sewer for Orono and Long Lake and discontinue <br />the operation of the :Orono and Long Lake Sewage Treatment Plants and that Alternate No. 1 of trams <br />Preliminary Engineering Report for interceptor service be provided in the place of these. two <br />sewage treatment" plants. -Alternate No. i calls' -for gravity interceptors throughOroro and <br />ung L- h e ane a ,pu.^:pirg station oral forcemain through Wayzata to the iffayzata interceptor. <br />2- 'That interim sewage flow capacity for Maple Plain and Lake Independence area be provided <br />_Jr. the Orono -Long Lake Interceptor until the <br />year. 2000. <br />J. <br />3. That theproject be recommended for approval rot federal and state grant application. <br />The plats and specifications 'forthe Orono -Long Lake project were approved by the Council <br />on June 27, 1974, Finally, on September 25, 1975, the Metropolitan Council adopted the <br />Waste Management Policy Plan which included the Orono -Long Lake project as an approved system <br />improvement ,)sroject recommended for construction- in '1976. . <br />However, despite the fact that the ;Orono -Lon; Lake project has received Council approval and tivzs certified for <br />federal and state grants for planning and construction, the project has not progressed to the <br />constructior. stage.. When the ,h-1WCC completed -its plans and specifications for the facility <br />_.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.