Laserfiche WebLink
t <br />s. <br />2335 ?[!. `%ush oA{Vuva.X 36 <br />• St. poa, /ye a 55H3 <br />pAone: 636-4600 <br />April 10, 1978 <br />Mr. Robert Mazanec <br />Senior Planner <br />Metropolitan Council <br />300 Metro Square Building <br />St. Paul, Minnesota 55101 <br />Re: Orono -Long Lake Interceptor <br />Our File No. 139 <br />Dear Mr. Mazanec: <br />emq 9,94-ze� <br />Otto G. Bonestroo, P.E. <br />Robert W. Rosene. P.E. <br />Joseph C. Anderlik, P.E. <br />Bradford A. Lemberg, P.E. <br />Robert D. Frigaard, P.E. <br />Richard E. Turner, P.E. <br />James C. Olson, P.E. <br />Lawrence F. Feldsien, P.E. <br />Glenn R. Cook, P.E. <br />Keith A. Gordon, P.E. <br />Thomas E. Noyes, P.E. <br />Richard W. Foster, P.E. <br />Robert G. Schunicht, P.E. <br />Marvin L. Sorvala, P.E. <br />Donald C. Burgardt, P.E. <br />Kenneth R. Meister, P.E. <br />Charles A. Erickson <br />Leo M. Pawelsky <br />Harlan M. Olson <br />The letter dated March 31, 1978, from John Boland to Mayor VanNest <br />fairly represents the items discussed and the understandings reached <br />between the Mayor of Orono, the MWCC Staff and the Council Staff at <br />the meetings of March 27 and March 30 at the Metropolitan Council <br />offices. <br />The City of Orono's support of the Orono -Long Lake facility, prior to <br />actually relocating the MUSA line and the MSSR line is a policy ques- <br />tion to be resolved by the Orono City Council. The Orono Council will <br />be considering this matter in the very near future. <br />s <br />Our firm has been directed by the City of Orono to prepare an interim <br />CSP, to the year 1980, as discussed at the March 30 meeting. We under- <br />stand that your office will be forwarding a set of guidelines to use <br />in the preparation of the interim CSP. In order to assist in the <br />preparation of the interim CSP and to aid the City Council in the eval- <br />uation of the policy decision to support the Orono -Long Lake Interceptor, <br />we have been requested to seek clarification of several specific items, <br />as follows: <br />1) What is the correct amount of the ultimate capacity of the <br />Orono -Long Lake Interceptor? <br />The revised System Statement, Page 19, lists the <br />ultimate average daily flow at 1.71 MGD. Addendum No. 3, - <br />revised Table 10 of the Preliminary Engineering Report in- <br />dicates 1.77 MGD. <br />2) What is the correct amount of the Ultimate design flow <br />from Orono? <br />• The revised System Statement, Page 19, lists the <br />amount at 1.09 MGD. Addendum No. 3, revised Table 10, <br />indicates 1.14 MGD. <br />Page 1. <br />