Laserfiche WebLink
Mr. Bernard J. Harrington <br />March 23, 1978 <br />• Page 2 <br />During our meeting of February 2, 1978, you indicated to us that, <br />in fact, there was additional hydraulic capacity in the forcemain <br />to serve some future growth in the rural service area of our City <br />and the question that we must have answered before we can support <br />the present design of the Orono interceptor, is what that future <br />capacity is and how you arrived at it. <br />Either the forcemain was designed for additional flows from the <br />rural service area of our City or the sewer service area of the <br />interceptor is incorrectly shown on the map provided with your <br />letter of March 1, 1978. <br />The City would like to have the answer to this question in sufficient <br />time that it can be reviewed by our staff and Council before the <br />Metropolitan Council makes a final determination of the design and <br />specifications of the Orono -Long Lake interceptor. <br />Thank you for your cooperation in this matter. <br />Y rs trul , <br />(� 0 <br />Brad Van est <br />Orono Mayor <br />cc: Representative'Robert L. Searles <br />John Boland, Metropolitan Council <br />Jim Daley, Metropolitan Council - <br />Bob Mazanec, Metropolitan Council Staff <br />Douglas Hall, Pollution Control Agency <br />Barbara Lukermann, Metropolitan Waste Control Commission <br />Otto Bonestroo, City Engineer <br />Bruce Malkerson, City Attorney <br />IP <br />