Laserfiche WebLink
-- __ --- --- P E <br />--- d,...,r,.. <br />C! O Ro N Ronnr, P! <br />-- ------- /,.,.PAC Andr,o(. P! <br />1335 V. -1 ,.4 36 -_ -- - — --- — - -- d..df„.d 4 I P I <br />I.— PI <br />Si P..l, M 53ff3 <br />/)A— 6f1-636-4600 <br />March 18, 1985 <br />City of Orono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn: Mr. John Cerhardson <br />Re: Our File No. 13918 <br />Crystal Bay Sanitary Sewer Improvements <br />Dear John: <br />GA -A R ( w1 P I <br />A WA Gwd—. P I <br />1Aoww E % s. P ! <br />Rw Mrd N loon•. P F <br />*0G &.4—hi, P E <br />Mime / Swale. P E <br />lbe.)d C 0wro,d,, P E <br />Jr— A fk . d.., P E <br />AluA A Hbe , P f <br />Ird A I,Nd. P E <br />Mrhd.I ) A....... P E <br />Rob", R Plrflr+lr, P E <br />D..,d (I EOfAwe. PE <br />CMrAry A &rA,on <br />I rv, .N Pra.rbAr <br />Hn4n .M (Abo. <br />We have reviewed the bids received on the Crystal Bay Sanitary Sewer Improve- <br />ment Project and would recommend award to A.R.I. Contracting, Inc, for the bid <br />amount of $691,587.65. We have worked with the low bidder on projects in the <br />past and feel that he can satisfactorily complete the project. <br />The following is a summary of all bids received on the project. <br />ARI Contracting, Inc. $691,587.65 <br />Progressive Contractors, Inc. $692,755.95 <br />Orfei and Sons $693,272.59 <br />Widmer, Inc. $769,380.00 <br />Barbarossa b Sons $797,130.00 <br />Lametti b Sons $840,000.00 <br />Northdale Construction $881,273.50 <br />A.P. Keller Construction $887,755,00 <br />Engineers Estimate $610,000.00 <br />'rhe low bids received were approximately 4 percent over the preliminary report <br />cost estimate. The following is a compariGon of the low received and the pre- <br />liminary report cost. <br />Pre1imina�-Re 4R.L Bid <br />Sewer Construction $455,550.00 $455,477.15 <br />Contingency (5%) 22,775.00 OZ.) 13,664.32 <br />Street Construction 198,400.00 236,110.50 <br />Contingency (5%) 9,920.00 (3%) 7,083.32 <br />Total Construction $686,645.00 $712,335.29 <br />Legal, Engineering 6 Admin. (25%) 171,655.00 178,083.83 <br />Total Project Cost $858,300.00 $890,419.12 <br />Cost/Unit (83 Units) $ 10,341.00 : 10,727.94 <br />Page 1. <br />6650c <br />