My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Orono
>
Planning Commission
>
2025
>
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
11/14/2025 3:44:29 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Full Packet
Document Date
11/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE # LA25-000033 <br />17 Nov 2025 <br />Page 6 of 8 <br />the Comprehensive Plan. The applicant is proposing to vacate the eastern 20 feet of the unimproved Cherry <br />Avenue and a 10-foot wide alley that cuts through the property. The remaining western 20 feet of the <br />unimproved Cherry Avenue would remain as right-of-way as it serves the Met Council's utility infrastructure <br />on site. <br />The Comp Plan identifies a lake access point approximately 200 feet to the west of the property on North <br />Arm (Lake Access Point #18). There is a second lake access approximately 1,200 feet to the west of the <br />property on North Arm (Lake Access Point #19). Additionally, there is a public boat launch ±0.5 mile east on <br />Maxwell Bay managed by the DNR. <br />The challenge with vacating rights -of -way is that vacation is final. Should the public or the City have access <br />or utility needs in the future, the cost to taxpayers to reacquire the property will be at a premium. For this <br />reason, vacation reduces options for the City in the future. The partial rights -of -way of Cherry Avenue and <br />the alley within the property do not serve as a benefit for the city to maintain right-of-way to the public and <br />within the site create a hindrance for the applicant to redevelop the property. The property has operated as <br />a public access since the 1960s and is proposed to maintain is public access by the County as part of this <br />project. A letter from the DNR is included as an Exhibit. The vacation of the identified portions of right-of- <br />way is supported by staff. Following the recommendation by the DNR, the City will retain the public access <br />easement over the right-of-way. <br />VARIANCES <br />Regarding practical difficulty, Staff finds that there are several challenging issues infringing on the County's <br />ability to improve the site. The lot's depth, the property's orientation along the curved shoreline, the right- <br />of-way, and the low elevation all support granting variances. <br />The inclusion of the "pervious" areas of hardcover offsets the total proposed hardcover level by ±22,000 <br />square feet, although by definition the overall hardcover of the site is increasing. The stormwater <br />management capabilities of the site are improving with the inclusion of best practices including a infiltration <br />system placed under the parking stalls, filtration circulator and limiting surface water runoff all supporting <br />the reconstructing of the hardcover. The site is a water -oriented use that serves the public. The new <br />accessory structures and buildings are replacement structures or new structures that support services <br />and/or utilities on site. The lighting, landscaping and maneuverability of the site will improve promoting <br />safety and access for the public. <br />CONDITIONAL USE PERMIT <br />The applicant's plan reflects new lake -perimeter stone steps along the eastern edge of the property. <br />Additionally, new fishing piers are proposed to support greater access to the lake. The new, in -lake <br />improvements are vertical installments which extend beyond the standard rip rap requirements, and are <br />regulated as "seawalls". The site currently has some areas of rip rap, an aging seawall in the channel, and <br />improvements around the boat access to support the public access use. The new and replacement seawall is <br />required to meet the conditional use permit standards and obtain all MCWD and DNR approvals. Efforts <br />should be made to incorporate a natural shoreline around the property where possible as to not limit use <br />of the site for the public. <br />INTERIM USE PERMIT <br />Staff finds the proposed project purpose and scope of the site grading is reasonable. The City Engineer is <br />reviewing the project and any comments will be presented for Council consideration. The project will be <br />reviewed again by the City Engineer at the time of the administrative grading permit. <br />SITE PLAN <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.