My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Orono
>
Planning Commission
>
2025
>
11-17-2025 - Agenda Packet Planning Commission - Full Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
11/14/2025 3:44:29 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Full Packet
Document Date
11/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Report of Geotechnical Exploration <br />North Arm Bay Boat Launch; Mound, MN <br />April 10, 2023 <br />AET Report No. P-0016964 <br />AAMEMICAN <br />(can be found on www.osha.gov). Even with the required OSHA sloping, water seepage or <br />surface runoff can potentially induce sideslope erosion or sloughing which could require slope <br />maintenance. <br />7.3 Observation and Testing <br />The recommendations in this report are based on the subsurface conditions found at our test <br />boring locations. Since the soil conditions can be expected to vary away from the soil boring <br />locations, we recommend on -site observation by a geotechnical engineer/technician during <br />construction to evaluate these potential changes. Soil density testing should also be performed <br />on new fill placed in order to document that project specifications for compaction have been <br />satisfied. <br />8.0 TEST STANDARDS <br />When we refer to a test Standard in this report, we mean that our services were performed in <br />general accordance with that standard. Compliance with any other standards referenced within <br />the specified standard is neither inferred nor implied. <br />9.0 LIMITATIONS <br />Within the limitations of scope, budget, and schedule, we have endeavored to provide our <br />services according to accepted geotechnical engineering practices at this time and location. <br />Other than this, no warranty, express or implied, is intended. Essential information regarding risk <br />management and proper use of this report is given in Appendix B entitled "Geotechnical Report <br />Limitations and Guidelines for Use." <br />Page 5 of 5 <br />124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.