Laserfiche WebLink
CITY OF ORONO <br />1985 BID TABULATIONS FOR STREET MATERIALS i EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS --EQUIPMENT IS BID PER HOURLY RATE <br />12" CMP <br />15" CMP <br />18" CMP <br />24" CMP <br />24" CMP <br />36" CMP <br />48" CMP <br />60" CMP <br />16 GAUGE <br />16 GAUGE <br />16 GAUGE <br />14 GAUGE <br />16 GAUGE <br />14 GAUGE <br />12 GAUGE <br />10 GAUGE <br />-------------------------------------------------------------------------------------------------- <br />ALL PRICES ARE TO <br />BE DELIVERED <br />Viking Steel Prod. <br />5.54 <br />6.51 <br />7.54 <br />11.92 <br />9.77 <br />18.36 <br />31.10 <br />52.80 <br />(2) <br />(2) <br />(2) <br />(1) <br />(2) <br />(2) <br />(1) <br />(1) <br />------------------------------------------------------------------------------------------------- <br />All Steel Products <br />5.50 <br />6.50 <br />7.50 <br />10.00 <br />8.50 <br />16.00 <br />29.00 <br />49.00 <br />(1) <br />ll) <br />Il) <br />• <br />a <br />• <br />• <br />-------------------------------------------------- <br />St. Regis <br />5.30 <br />6.25 <br />7.25 <br />12.00 <br />9.50 <br />18.00 <br />32.00 <br />54.50 <br />• <br />+ <br />+ <br />(2) <br />(1) <br />(1) <br />(2) <br />(2) <br />• DENOTES LOW BID <br />1-3 ALTERNATES <br />