My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-1985 Council Packet
Orono
>
City Council
>
1985
>
02-25-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:32:01 AM
Creation date
11/13/2025 11:28:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Mayor Butler <br />Orono Councilmembers <br />FROM: Jean A. Mabusth <br />DATE: Fe' . 1985 <br />SUBJECT: #853 L_ s Klint, Tom <br />and 3545 ivy Place and <br />Preliminary Subdivision <br />AL 1lCETNO <br />FEB 29r1985 <br />e OF OR= <br />Bernier, and Gary Barr, 3535 <br />3034 Casco Point Road - <br />Zoning District - LR-lC <br />Area = 2.7 acres exclusive of road right of way <br />Application = Plat - I.ot Line Rearrangement <br />List of Exhibits <br />Exhibit A - Application <br />Exhibit B - Plat Map <br />Exhibit C - Property Owner's List <br />Exhibit P - Preliminary Plan <br />The proposed lot line rearrangement_ of the three developed lots <br />will provide riparian access to the Barr and former Bernier <br />residences. All three lots meet the required 1/2 acre minimum <br />lot area and 100 feet minimum lot width per LR-1C zoning <br />district. No setback encroachments would be created for existing <br />houses and accessory structures as a result of this division. <br />The plat reflects the partial vacation of Maple Avenue. The area <br />designated on plat as "to be dedicated as road" within Ivy Lane <br />right of way has already been granted to City via quit claim deed <br />per condition of Maple Avenue vacation of two months ago. Plat <br />should be corrected. The municipal sewer- and water lines have <br />been located and designated as 20 feet wide utility easements at <br />engineer's request. The utility easements do not restrict the <br />proposed building envelopes. <br />A drainageway that intersects Lot 2 and 3 has been provided for <br />by increasing the utility and drainage easement width to 10 feet <br />on either side of the shared lot line. <br />Staff recommends approval of the plat of a lot line rearrangement <br />known as Casco Cove finding all lc:s meet the standards of the <br />LR-IC zoning district and that all existing structures meet the <br />required setbacks for the district. Approval is subject to the <br />condition that the plat be amended to reflect the City's <br />ownership of that portion of Ivy Lane referred to on the <br />preliminary plat as "to be dedicated as road". <br />
The URL can be used to link to this page
Your browser does not support the video tag.