Laserfiche WebLink
ro <br />0 <br />1 ?In I. RING ANT) GRUBRINC <br />A SQecific Re uirements <br />t ?101,0, SPF.CIFiCATIoN REFERENCE: Unless otherwise noted or modified herein, <br />all sections of the General Requirements shall apply. <br />71M .1- DESCRIPTION: This work shall consist of the removal of trees, <br />shrnhs, and stumps, and the replacement and/or planting of small trees and <br />shruhs As directed by the Fngineer. <br />?lnl,3, fONSTRUCTTnN RF.QIIIR_F;MF,NTS: The contractor shall remove only those <br />,,. trees specifically designated for removal by the Engineer. The trees and <br />chruhbery shall he saved as much as practical. No tree or shrub shall be <br />remk.ved until the contractor has reviewed tree removal in the field with the <br />Engineer. 'frees and whrubs removed on the project without permission of the <br />Fngineer shall he replaced by the contractor with no compensation. <br />All tiughes, whrubs and small trees !R" diameter or less? which fall in the <br />M excavation and in tjie opinion of the Engineer should he saved shall be <br />It excavated out, set to the side avvi replanted after placement of the sewer <br />line. The contractor shall use great care when relocating trees but will not <br />he responsible for survival of trees or shrubs relocated and do not survive as <br />M bid in the proposal. The treen to he planted shall be balled and !Sagged and <br />1� be a minimum diameter of three inches for Aiciduous trees and a minimum height <br />of 6 feet for coniferous trees. <br />M <br />Where over -hanging branches are broken by construction activity, the Contrac- <br />tor shall promptly trim such broken branches in a neat and presentable man- <br />ner. Such work shall he considered incidental to the contract. <br />t+ Where trees are designated on the Ian to h� t g p saved, he width of the trench <br />may have to he restricted so that adequate and safe side slopes can be stain- <br />` ta;ned. The Contractor shall provide protective bracing, sheeting or box to <br />provide safe conditions for the workmen as incidental to the contract. <br />?101.1,4. DISPnSAI.: All timbor and debris shall be removed from the project <br />Area to a disposal area to he selected and provided for by the contractor. Ne <br />htirving of debris wi I l be permitted. Rurning, if allowed, twist be in accord- <br />ince with State and City requirements <br />M <br />In the event that property ,wners make a claim tnr the <br />wood from trees <br />removed <br />from their property, it shall he made available to them. The contractor <br />shall <br />fell the trees, cut into reasonable lengths and stack <br />for removal by <br />the <br />pro-perty <br />owner. Anv extra work required, above and beyond <br />that required <br />for dis- <br />nosal of wood by the contractor, shall be covered by c,Sanite <br />order to <br />the con- <br />tract. No claim for extra compensation shall he made <br />by the contractor for <br />inns of wood or wood proAucts. <br />M <br />1 <br />is <br />t 0- S64 ! c <br />ropvrin%t 1495 <br />Ronostroo, Romenw, Anlerl iF <br />4 Aasecistea, Inc. <br />