My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO COUNCIL MEETING HELD FEBRUAkY 11, 1985. PAGE 9 <br />CRYSTAL BAY SEWER <br />PROJECT REPORT City Engineer Cook reviewed with the Council the pans and <br />specs of the Crystal Bay Sewer Project. Cook noted that the <br />assessment hearing would be held April 22, 1985. <br />Mayor Butler asked staff to reserve the rrt Center's <br />Auditorium for the assessment hearing on April 22, 1985 and <br />the regular Council meeting will be held that night also. <br />Butler suggested a bulk mailing tG the general public so that <br />they snow what port ion of the sewer project they wi 11 have to <br />pay also. <br />Mayor Butler moves:, Councilmember Grabek seconded, to <br />approve the plans and specs and direct staff to advertise for <br />bids. Motion, Ayes (`.), Nays (0). <br />City Engineer Cook stated that he needs Council permission to <br />begin the easement acquisition procedure. <br />Councilmember Frahm stated that the City should not go to <br />such expense until they are sure whether the sewer project <br />will go through or not. <br />Councilmember L. Adams moved, Councilmember Grabek <br />seconded, to direct staff to begin the easement acquisition <br />procedure. Motion, Ayes (4), Nays (1). <br />Councilmember Frahm :voted nay. <br />City Engineer Cook noted the additional costs in regard to <br />the cost of installing City water at the same time the sewer is <br />installed. Cook stated that there are two options for <br />providing water service to the area. Cook noted the <br />estimated cost for the lateral system is S297,060 resulting <br />in a unit cost of $3,580 for 93 units. Cook noted the <br />estimated cost for the well and pressure syst �m is $289,800 <br />and the estimated cost for the trunk water line from Long Lake <br />is $514,380. <br />Councilmember L.Adamsmoved, Councilmember Frahm seconded, <br />to cease further di.scussicn or investigation into the idea of <br />installing water at ho ;ame time in the Crystal Say area. <br />Motion, Ayes (5), Nays (0). <br />MAYOR'S REPORT Mayor Butler told the Counci 1 of phone cal is that she has been <br />receiving from a Mound resident (Ron Johnson) who is asking <br />that the Orono Council draf t a letter to the City Council of <br />Mound opposing the develcpment at Pelican Point in Mound. <br />Butler explained that this development is proposing massive <br />dockage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.