My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rom, 4M&441z & 4u0ci444,94, y c. <br />ZJJ6 'u/. I. —A .4VA...y J6 <br />dr. A.4 55t1J <br />No.- 612- 6J64600 <br />February 7, 1985 <br />City of Orono <br />Box 66 <br />Cr-ital Bay, MN 55323 <br />Attn: Mr. John Gerhardson <br />Re: Our File No. 139 <br />Crystal Bay Water System <br />Dear John: <br />FEB 1119e ; (—A. PP[ <br />Om' 6 IWnnm.., P t /Aoww E Soon. P f <br />Rofr l f ow.r, PA/� 1worM. P I <br />J"'P4 ■ 'r d. Z O r..rAr. P f <br />Indl d A I —1,"" P f 3m»4. P r <br />9.404f N.W. P f DOWN r R.rr.ror, P I <br />je— r Uh.... P t /nrr A Aw dro . P L <br />A4011 A H...o.. P E <br />red A f.rld, P f <br />N.A04 r RM.r... P I <br />RoArrt R. PJr/fnrr. P E <br />%,d O Lada., P E <br />CA.rin A Emkw" <br />I Af P..ebt. <br />Hero. .M rk.o. <br />We have reviewed the cost of constructing water lines in the Crystal Bay <br />area. The cost estimate is based on completing the water lint! in conjunction <br />with the sanitary sewer construction. We have also reviewed two options for <br />providing water service to the area. The first option would be to construct a <br />well, pumphouse, and pressure system and the second option would be connec- <br />tion to the Long Lake system. <br />The estimated cost for the lateral system is $297,060, resulting in a unit <br />cost of $3,580 for 83 units. <br />The estimated cost for the well and pressure system is $289,800 and the esti- <br />mated cost for the trunk water line from Long Lake is $514,380. <br />The advantage of the trunk water line is that adequate fire protection would <br />be available for the area. The well and pressure system will only provide <br />minimal fire protection. <br />If you have any questions, please contact this office. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK 6 ASSOCIATES, INC. <br />Glenn R. Cook <br />GRC:sas <br />EncI <br />5878c <br />
The URL can be used to link to this page
Your browser does not support the video tag.