f <br />17 <br />10.9.2 in lieu of the issuance of a certificate of Substantial completion as <br />to part of the Work, Owner may take over operation of a facility constituting <br />M part of the Work whether or not it is substantially complete if such facility <br />is functionally and separately usable; provided that prior to any such take- <br />over, Owner and Contractor have agreed as to the division of responsibilities <br />M between Owner and Contractor for security, operation, safety, maintenance, <br />correction period, heat, utilities and insurance w th rospect of such facility. <br />10.8.3 No occupancy of part of the Work or taking over of operations of a fa- <br />cility will be accomplished prior to compliance with the requirements of Sec- <br />tion 8.1 in respect of property insurance. <br />10.9 FINAL INS?ECT10N <br />Upon writren notice from Contractor that the Work is complete, Engineer will <br />make a final inspection with Owner and Contractor and will notify Contractor <br />in writing of all particulars in which this inspection reveals that the Work <br />is incomplete or defective. Contractor shall immediately take such measures <br />as are necessary to remedy such deficiencies. <br />10.10 FINAL APPLICATION FOR PAYMENT <br />W After Contractor has completed all such corrections to the satisfaction of En - <br />it gineer and delivered all maintenance and operating instructions, schedules, <br />guarantees, bonds, certificates of inspection, marked -up record documents and <br />other documents -- all as required by the Contract Documents, and after Engi- <br />neer has indicated that the Work is acceptable (subject to the provisions of <br />St Lion 10.12), Contractor may make application for final payment following <br />t!e procedure for progress payments. The final Application for Payment shall <br />ij be a,.• )mpanied by all documentation called for in the Contract Documents and <br />1i such ether data and schedules as Engineer may reasonably require, together <br />with complete and legally effective releases or waivers (satisfactory to Own- <br />1Y ir) of all Liens arising out of or filed in connection with the Work. In lieu <br />t* thereof and as approved by Owner, Contractor may furnish receipts or releases <br />in full; an affidavit of Contractor that the releases and receipts include all <br />labor, services, material and equipment for which a Lien could be filed, and <br />'# that all payrolls, material and equipment bills, and ether indebtedness con- <br />nected with the Work for which Owner or hi- property might in any way be re- <br />sponsible, have been paid or otherwise satisfied; and consent of the Surety, <br />t, if any, to final payment. If any Subcontractor, manufacturer, fabricator, <br />t� supplier or distributor fails to furnish a release or receipt in full, Con- <br />tractor may fu nish a Bond or other collateral satfstactory to Owner to indem- <br />nify C •ainst any Lien. <br />10.11 1 YMENT AND ACCEPTANCE <br />j; If, on 'hi of F.nRir,eer's observation of the Work during construction and <br />M final inspc and Engineer's review of the final Application for Payment <br />and accompan_,,ng documentation -- al'. as required by the Contract Documents, <br />Engineer 19 satisfied that the Work has been completed and Contractor has fui- <br />h - 3r, - <br />•1545a <br />b/81 <br />bL, _, . <br />