Laserfiche WebLink
• <br />M <br />is <br />N <br />i <br />Minimum Lim itF, - General liability <br />1. Bodily injury <br />2. Property damago <br />Minimum Limits - Automobile. Liability <br />1. Bodily injury <br />2. Property damage <br />$500,000.00 each occurrence <br />$500,(00.00 completed operations <br />$100,000.00 each occurrence <br />$200,000.00 aggregate <br />5250,000.00 each person <br />$500,000.00 each occurrence <br />$100,000.00 each occurrence <br />$200.000.00 aggregate <br />It is required that basic exclisions for damage caused by explosion, collapse <br />and damage to underground faci'ities, commonly known as X, C, U exclusions, be <br />removed from the policies and so indicated as covered in the declaration and <br />on certificates of insurance. This provision of the Conditions of the <br />Contract will be waived on above ground projects where hazards of explosion <br />and/or collapse do not exist. The exclusion of explosion will be waived on <br />underground projects where blasting is not required and where the hazards of <br />explosion do not exist. <br />In addition to all of the listed coverages, the Contractor shall procure and <br />saintain an Umbrella Excess Liability Policy in a minimum limit of <br />$1,000,000.00. <br />9.1.4 Builder'sRisk Insurance: Before commencement of the Work, the <br />Contractor shall provide Builder's Risk Insurance on a multiple peril form <br />in the full amount of the total construction and material contract. Such <br />insurance shall contain aii appropriate rider to include as Additional <br />Named Insureds, the Owner, the Engineer and his consultants, and each of <br />their officers, employees and agents, all suhcontractors, the equipment <br />contractors and all of their subcontractors on the construction premises. <br />Such insurance may have a deductible clause but the deductible amount <br />shall he borne by the Contr.ctor and shall :not exceed $1,000.00. <br />The Builder'a Risk Insurance required hereie, shall apply to projects <br />' involving construction of structures and building only. ►'he requirement{ <br />of this section shall be iaived on projects involving only underground <br />utilities, grading, street improvements and similar construction work, but <br />ra any damage or toss to property shall be the sole responsibility of the <br />Contractor un'il final acceptance of the Work. <br />I� <br />If the Owner finds it necessary to occupy or use a portion or portions of <br />the Work prior to aunstantiil completion thereof, such occupancy shall not <br />commence prior to a time mitually agreed to by the Owner and Contractor <br />and to which the insurance company or companies providing the property <br />insurance have, consented by endorsement to the policy or , ,,l is ies. This <br />insurance shall not be carcellod or iApsed -n account ,f curl- partial <br />3S2ha <br />4181 <br />