My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19. Wet well level -responsive automatic pump and alarm control system using <br />the direct -acting_ liquid level sensors in the wet well. A controller/ <br />Alternator shall have censor operation Simulation test switches, solid <br />state alternation logic, lead pump alternation on successive starts, al- <br />ternator over -ride control (auto, 1-2, 2-1), 24 volt sensor excitation, <br />alarm and pump control relays. Provide an adjustable 0 - W) second timer <br />to delay starting of the lag pump sucF, that if the wet 11 floods hiring <br />a power outage, both pumps will not start at the same tir <br />14. An inner door mounted duplex GFI type convenience receptacle rated at 15 <br />ampers shall be supplied for the operating of trouble lights, drills, <br />etc. It shall be protected by a separate 15 ampere trip rated circuit <br />hreak.r. <br />20. NAaters shall he provided of the size and number to prevent condensation <br />inside the panel. Heaters shall he thermost.tically controlled and shall <br />he field adjustable. <br />21. provide normally closed relay that will open neon any alarm condition or <br />power failure for future telemetry to a remote location. <br />35,100.10. PIPING AND VALVES: Piping, valves and fittings shall be of the <br />size and type shown on the plans. All pipe And fittings inside the pump cham- <br />ber and valve vault shall be ductile iron or cast iron with 125 lb. flanged <br />joints conforming to AWWA C110. r115, (:150 and (151. Gaskets shall be utility <br />ring gaskets. All pipe and fittings shall he furnished with standard <br />thickness cement mortar lining conforming to AWWA C104. All huried iron pipe <br />shall he electrically conductive. <br />F..ach pump discharge shall be provided with a shk,toff valve and two check <br />valves. Shutoff valves shall he De7.urik Eccentric Valves or approved equal <br />fitted with sealing materials for water service. Valves shall he designed for <br />150 psi working pressure and furnished with Class 1?5 lb. flanges. Valves <br />shall be epoxy coated inside and outside. The val.ves shall be furnished with <br />an extension stem with universal joint and flour box cast into top slab as <br />shown on the plans. Fxtension stem shall he secured to valve operator. <br />Check valves shall be Flvgt HDL or Grav Series 5000 hall check valves with <br />cast iron body with nitril rubber coated steel hall -Aided by smooth rib, cast <br />in the body wall. Valve shall he designed for I'),) Dgi working prear..ire and <br />furnished with Class 125 lb. flanges. <br />;5,100.11. PAINTING: All metal surfaces inside the wet well, except aluminum <br />access hatch and ladder, galvaniz�1 guide bars, factory finished pumps and <br />metal fac,-s of the pump discharge connections, shall be painted with two coats <br />of Koppers 300-M or approved equal. The pump manufacturer shall supply a <br />touch-up kit for repairing the pump finish. <br />3g,100-In <br />n-- 5A41 c <br />t'.,pvr i ght I QM <br />R:.nest rocs, Rospne . An-'e r I i k <br />6 Associate+, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.