My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
35,1nO.3. PUMP _CHAMRF:R: The pump chamber shown on the plans shall be con- <br />structed of a pour.,od-in-place base sla►,, precast manhole sections and a <br />precast top slap. Manhole sections shall conform to A.S.T.m. Designation <br />C-748 using gasketed joints, ,r approved equal. The pump chamber shall be <br />watertight with all lifting holt,s, j,,ints, etc, neatly mortared up. <br />The pump chamber shown on the plans is designed to be constructed in a <br />dewatered, open ex, avarion. However, the contractor may h,e•l(1 ►he pump <br />•hamher using a caisson method with the following requirements-. <br />1. The contractor shall obtain the Fngineer's approval nrinr tc <br />proceeding with the caisson merhod. <br />2. The contractor shall submit a detail sketch showing all structure <br />modifications necessary to use the caisson method for buiIdinit, the pump <br />chamber. These modifications include, but are not limited a method nr <br />attaching the precast sections !ogether, a concrete bottom seal, a reinforced <br />concrete bottom slat), adequate structural integrity rn assure resiRtAnce to <br />up -lift or buovancv, anv modification to the bottom <)f the vertica` walls <br />needed ro build the structure a5 a raiser-1. <br />3. The contractor shall cuhmir fo,er (4) copies of al' ske.tchea re the <br />Fngineer for approval. <br />4. The contractor shall outline to the Engineer, the construction <br />procedure to be used for h,eildinR the structure as a r.Hicsnn. <br />5. The contractor shall ;ubmit, for reference, A Iiat of projects <br />completed by the contractor where the caisvnn method has `+een used. <br />The lift station shall he backf11led with selected material from the site free <br />Of organi-9, wood fragments, roots, stumps, rubbish, frozen materials or <br />similar art .^les whose presence would cans.- settlement. In the event that an <br />insufficient ,mount of suitable material is available on Rite, the :ontractor <br />shall provide Oditional common borrow material subject to the approval of the <br />Fnxineer. Bal 'll shall bP placers in h inch !nose lifts ovenly around <br />structure and _omp.-tetd by mechanical means. Any settlement around the <br />station occurring. within ,:ne year shall tie repaired by the contractor.. includ- <br />ing anv surface materials. If dewnterinle equipment is being .iced for cnn- <br />stnu:tion, it shAl! not he turned off until backfiiling is complete. <br />The contractor shall grout the bottom of the pump chsmherr as recommended by <br />the pump manutacturer or O nwn on the plan to efficiently remove and prevent <br />scrrmulAtion of waste materials. <br />('11- 5 941 c. <br />"')pvriI"t 19A5 <br />p,lnastroo, Rnsernr, AndPr 1 ik <br />Go As saci.Rtra, inc. <br />35,1nA-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.