My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />if <br />Ll <br />rl <br />n <br />No additional compensation will be allowed for installation of the <br />markers describe, ahovc but. Fhall he ennsidered incidental to the service line. <br />Curb boxes are to be placed In a vertical position as shown on the <br />standard detail plate in these specifications. The top of each box shall be <br />placed at finish grade of the boulevard which J• 0.4 feet above centerline <br />profile which in the top of the manholr grade. Grade stakes shall be fur- <br />nished to establish elevations. <br />Services shall be installed in accordance with the detail plate included <br />in this specification. No service line trench shall be backfilled until the <br />service has been inspected and approved by the Engineer or hiQ inspector. <br />25,000.-, . EXISTING UTILITIES: Ey.lsting underground utilities are shown on <br />the plans only by general location. The Owner does not guarantee the loca- <br />tions ,, shown on the plans, and the Contractor :hall be solely responsible <br />for verifying the exact location of each r,f these utilities without addition- <br />al compensation. Prior to the start of any construction, the Contractor shall <br />have sole responsibility for providing temporary support and for protecting <br />and in, staining all utilities in the pro_lect area during the entire period of <br />construction including the period of water and sewer, installation. In carry- <br />ing out this responsibility the Contractor shall exercise particular care, <br />wherever gas mains or other utility lines are croaseA, t.r, prnvide compacted <br />bacxfill or ether stable support for r::,ch lines to prevent anv detrimental <br />displacement, rupture or other failure. <br />25,000.6. METHOD OF MEASUREMENT 6 PAYMENT: Method of measurement and payment <br />for each item covered under this section shall be as follows: <br />25,000.6A. SEWEH SERVICE LINE: Sewer nervice iines shall be paid for at the <br />contract unit price per foot which shall include the cost of all pipe, fit- <br />tings, gaskets, plug, excavation and tack.fil'. Payment shall be from centet- <br />line of the main to the property line only =a shown otherwise on the <br />detail plate. <br />25,OOG.6H. WATER SERVICE LINE: Water service lines shall be paid for at the <br />contract unit price per foot which shall include the crst of all pipe, ;'it- <br />tings, laying, excavation, backl illing and testing. Payment sha " be from <br />centerllne of the main to the property line only unless shown otherwit r: the <br />detail plate. <br />25,000.6C. CUHB STOr b BOX: Curt, stop and bnx shall he paid for at the con- <br />tract unit price per curb :.top and box i,rtaiied. <br />25,000.61). COHPOHAiION COOK: .�lrpnral irn cock shah tse paid for at the con- <br />tract unit price per corporat,.-c r•-k :ns►allr�. <br />3/7S <br />10,% <br />ASSUCIATES, INC• 1984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.