1
<br />24,000.3.A3. Field In4pection: A11 pipe an:l accessories shall bo. I:lid,
<br />jointed, tested for defects and for infiltration in the manner herein speci-
<br />fied as directed by the Fngin(-r ana auhj=act tc, his approval.
<br />24,000.3.A4. Dis osition of Defective Material: All material found during
<br />the progress of the work ko have- cracks, flaws or other defects will be re-
<br />jected by the Engineer and the Contractor shill promptly remove from the site
<br />of the work s±.ich defective materi:nt.
<br />24,000.3.8. ►ONTRA('TOR'S RESPONSIBILITY FOR MATERIAL:
<br />24,n00,3.H1. l spo 7JIFIT1ty for Matertal F'urntshed by''ontractor: The Con-
<br />- - -- --------—
<br />tractor shall be responsible for all material furnished by him and he shall
<br />replace at his own expense all such material that is found to be defective in
<br />manufacture or that has become damaged after delivery by the manufacturer.
<br />24,n00.3.R?. Responsibility _for _Safe Store; The Contractor shall be re-
<br />sponsible for the :safe storage of material furnished by or to him, and ac-
<br />cepted by him, and intended for the work, until it has been incorporated in
<br />the completed project.
<br />24,000.3.C. HANDLING PIPE_ b ACCESSORIES: Pipe and other accessories shall,
<br />unless otherwise directed, be unleaded at the point of delivery, hauled to and
<br />distributed at the site of the project by the Contractor; they shall at all
<br />times he handled with care to avoid damage.
<br />Z-4,000.3.D. ALICN?1ENT 6 CRADF. 6 1�NDFRrR1WNf) SUR1:AC: 6 OVERHEAT)-11TII.ITIES
<br />24,n0o.3.D1. General: All pipe shall belaid and maintained to the required
<br />line.% and grades; with tees, wyes, catch basins, special ecru^cures and man-
<br />holes nt the required location9; and with joints centered and spigots home.
<br />24,000.3.D2. Fxistin Utilitiee: Existinc water and Fewer mains, and other
<br />underground utilities, are shown on the plans only by general location. The
<br />Owner does not guarantee that the utilities are complete «r that the locations
<br />to are as shown on the plans, and the Contractor shall be solely responsible for
<br />verifying the exact location of each of these utilities, without additional
<br />IN compensation. Prior to the star" of any construction, the Contractor Shall
<br />notify all utility companies having utilities in the Project Area. The Con
<br />tractor shall have sole responsibility for providing temporary support and for
<br />e1
<br />protecting and maintaining all existing utilities in the Project Area during
<br />the entire period of construction, including but not limited to the period of
<br />excavation, backfill and compacti:±n. In carrving. o,it this responsibility, the
<br />Contractor shall exercise pflrtir±ilar cnre, whenever gas mains or other utility
<br />h lines are crossed, to provide compacted hackfill or other stable support for
<br />g, -vwh lines to prevent any detrimental displacement, rupture or other failure.
<br />24,000,1.03. Deviations Occasioned by
<br />Other Utility Structures:
<br />Wherever ex-
<br />lsting ±:tiIity aCrUCCUreB or branch connections
<br />leading to main
<br />severs or to
<br />main drains or other conduits, ducts,
<br />pipe or struct,,res present
<br />obatructions
<br />to *ho grade and alignment of tba- pipe,
<br />thev shall be permanently
<br />supported,
<br />re -roved, relocated, or recnns* rur-toA
<br />by tttp Contractor through
<br />cooperation
<br />2/84/4S54b
<br />Copyright tgR4
<br />Sonestroo, ►Ausene, Anderlik
<br />4 Associates, Inc.
<br />
|