Laserfiche WebLink
1 <br />24,000.3.A3. Field In4pection: A11 pipe an:l accessories shall bo. I:lid, <br />jointed, tested for defects and for infiltration in the manner herein speci- <br />fied as directed by the Fngin(-r ana auhj=act tc, his approval. <br />24,000.3.A4. Dis osition of Defective Material: All material found during <br />the progress of the work ko have- cracks, flaws or other defects will be re- <br />jected by the Engineer and the Contractor shill promptly remove from the site <br />of the work s±.ich defective materi:nt. <br />24,000.3.8. ►ONTRA('TOR'S RESPONSIBILITY FOR MATERIAL: <br />24,n00,3.H1. l spo 7JIFIT1ty for Matertal F'urntshed by''ontractor: The Con- <br />- - -- --------— <br />tractor shall be responsible for all material furnished by him and he shall <br />replace at his own expense all such material that is found to be defective in <br />manufacture or that has become damaged after delivery by the manufacturer. <br />24,n00.3.R?. Responsibility _for _Safe Store; The Contractor shall be re- <br />sponsible for the :safe storage of material furnished by or to him, and ac- <br />cepted by him, and intended for the work, until it has been incorporated in <br />the completed project. <br />24,000.3.C. HANDLING PIPE_ b ACCESSORIES: Pipe and other accessories shall, <br />unless otherwise directed, be unleaded at the point of delivery, hauled to and <br />distributed at the site of the project by the Contractor; they shall at all <br />times he handled with care to avoid damage. <br />Z-4,000.3.D. ALICN?1ENT 6 CRADF. 6 1�NDFRrR1WNf) SUR1:AC: 6 OVERHEAT)-11TII.ITIES <br />24,n0o.3.D1. General: All pipe shall belaid and maintained to the required <br />line.% and grades; with tees, wyes, catch basins, special ecru^cures and man- <br />holes nt the required location9; and with joints centered and spigots home. <br />24,000.3.D2. Fxistin Utilitiee: Existinc water and Fewer mains, and other <br />underground utilities, are shown on the plans only by general location. The <br />Owner does not guarantee that the utilities are complete «r that the locations <br />to are as shown on the plans, and the Contractor shall be solely responsible for <br />verifying the exact location of each of these utilities, without additional <br />IN compensation. Prior to the star" of any construction, the Contractor Shall <br />notify all utility companies having utilities in the Project Area. The Con <br />tractor shall have sole responsibility for providing temporary support and for <br />e1 <br />protecting and maintaining all existing utilities in the Project Area during <br />the entire period of construction, including but not limited to the period of <br />excavation, backfill and compacti:±n. In carrving. o,it this responsibility, the <br />Contractor shall exercise pflrtir±ilar cnre, whenever gas mains or other utility <br />h lines are crossed, to provide compacted hackfill or other stable support for <br />g, -vwh lines to prevent any detrimental displacement, rupture or other failure. <br />24,000,1.03. Deviations Occasioned by <br />Other Utility Structures: <br />Wherever ex- <br />lsting ±:tiIity aCrUCCUreB or branch connections <br />leading to main <br />severs or to <br />main drains or other conduits, ducts, <br />pipe or struct,,res present <br />obatructions <br />to *ho grade and alignment of tba- pipe, <br />thev shall be permanently <br />supported, <br />re -roved, relocated, or recnns* rur-toA <br />by tttp Contractor through <br />cooperation <br />2/84/4S54b <br />Copyright tgR4 <br />Sonestroo, ►Ausene, Anderlik <br />4 Associates, Inc. <br />