My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 897
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 0800 - 0899 (June 27, 1977 April 13, 1978)
>
Resolution 897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:13:15 PM
Creation date
11/13/2015 3:13:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• the applicant and conditioned upon the completion of the <br />final plat and other prerequisites of final plat approval. <br />7. On May 7, 1976, the then building inspector, Alan <br />Olson, met on the site with Mr. Plowman and the building <br />inspector's report shows that there was a need for soil test- <br />ing and drainage problem investigation prior to any final <br />action. <br />8. On or shortly before June 17, 1976, the city <br />received the mylars and hardshell drawings for final plat <br />approval. The drawings were dated April 12, 1976, and were <br />submitted to the city over one year after the preliminary <br />plat approval on March 25, 1975. <br />9. The Planning Commission reviewed the final plat <br />on June 21, 1976, and recommended approval conditioned upon <br />the City Engineer's approval of the drainage plan and upon <br />receipt of the park dedication fee and the other prerequisites <br />of the final plat. <br />10. No variance had been applied for still at this <br />point in time. Both lots would have required the granting <br />of a variance during the subdivision process. <br />11. On June 28, 1976, the City Council approved the <br />• final plat for Joseph Braun subject to the City Engineer's <br />approval of the drainage plans, which were not submitted to <br />the city until January, 1978, almost three years after the <br />initial application and one and one-half years after the <br />contingent approval of the City Council on June 28, 1976, <br />and contingent upon the other prerequisites of final plat <br />approval. <br />• <br />12. On October 26, 1976, Steve Plowman applied for a <br />building permit on the proposed additional lot, which appli- <br />cation was held without approval due to the lack of drainage <br />plans and the lack of final subdivision completion and <br />approval. <br />13. On August 24, 1977, almost one year after the <br />application for a building permit, the plans held by the <br />city for the building permit were destroyed due to the lack <br />of interest or contact from Mr. Plowman or Mr. Braun. <br />14. On October 17, 1977, the city received a letter <br />from Mr. Braun requesting reapproval of the subdivision <br />request "which was acted upon at the City Council meeting of <br />March 25, 1975," thereby indicating his knowledge of the lack <br />of subdivision completion after two and one-half years. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.