My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 894
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 0800 - 0899 (June 27, 1977 April 13, 1978)
>
Resolution 894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:12:21 PM
Creation date
11/13/2015 3:12:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y <br />y <br />0 <br />0 24. A pump shall be used as specified in Section 5B. <br />C� <br />25. Pressure Distribution: <br />(a) Perforation holes shall be three -sixteenths to <br />one-fourth inch in diameter drilled in a <br />straight line along the length of the pipe. <br />Hole spacing shall be 36 inches. Holes shall <br />be drilled straight into the pipe and not at <br />an angle. <br />(b) The perforated pipe laterals shall be connected <br />to a two-inch diameter manifold pipe with the <br />ends capped. The laterals shall be spaced no <br />further than 40 inches on center and no further <br />than 20 inches -from the edge of the filter <br />material. <br />(c) The perforated pipe laterals shall be installed <br />level with the perforations downward. <br />(d) The manifold pipe shall be connected to the <br />supply pipe from the pump. The manifold shall <br />be sloped toward the supply pipe from the pump. <br />26. Additional Construction Procedures-: <br />(a) Additional construction procedures and methods <br />can be found in the mound packages available <br />from City Hall. <br />BU -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.