Laserfiche WebLink
Manufactured Home Installation $275.00 plus <br />State Surcharge and requires a regular building <br />permit if also doing basement, foundation, garage <br />or entryway, fees are based on sq. ft. State Table $275.00 <br />Refunds: 80% of building permit fees on projects not yet started (within 90 <br />days of permit issuance by municipality). No refund on plan review fees, state <br />surcharge or maintenance permits <br />City Administrator may require an erosion control escrow for projects <br />disturbing soils. $1,000.00 <br />Valuation based on ICC 2024 Building Valuation <br />tables <br />Total Valuation Fee <br />$1.00 to $500.00 $29.50 <br />$501.00 to $2,000.00 $28 for the first $500.00 plus $3.70 for eal <br />$2,000.00 <br />to $25,000.00 <br />to $50,000.00 <br />to $100,000.00 <br />to $500,000.00 <br />to <br />State Surcharge as require <br />Demolition <br />Demolition: Principal structure <br />Demolition: Accessory structure/Septic sy e <br />(Per unit fee) <br />City Engineer may require an erosion control <br />escrow for projects disturbing soils. <br />$83.50 for the first $2,000.00 plus $1'M <br />including $25,000.00 <br />$464.15 for the first $25,000.00 <br />including $50,000.00 <br />$764.15 for the firs 000.00 plu <br />including $100,000 <br />for each <br />fraction thereof, to and including <br />I � or fraction thereof, to and <br />or fraction thereof, to and <br />1$1,000.00, or fraction thereof, to and <br />the first $100, plus $6.7 ach additional $1,000.00, or fraction thereof, to <br />$500,000.00 <br />L$500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to <br />the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof <br />$100.00 <br />$50.00 <br />Not to Exceed <br />$1,000.00 <br />4of19 <br />