My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-2025 - Agenda Packet Cc - Work Session
Orono
>
City Council
>
2025
>
11-10-2025 - Agenda Packet Cc - Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:01:13 PM
Creation date
11/7/2025 5:00:51 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Work Session
Document Date
11/10/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Manufactured Home Installation $275.00 plus <br />State Surcharge and requires a regular building <br />permit if also doing basement, foundation, garage <br />or entryway, fees are based on sq. ft. State Table $275.00 <br />Refunds: 80% of building permit fees on projects not yet started (within 90 <br />days of permit issuance by municipality). No refund on plan review fees, state <br />surcharge or maintenance permits <br />City Administrator may require an erosion control escrow for projects <br />disturbing soils. $1,000.00 <br />Valuation based on ICC 2024 Building Valuation <br />tables <br />Total Valuation Fee <br />$1.00 to $500.00 $29.50 <br />$501.00 to $2,000.00 $28 for the first $500.00 plus $3.70 for eal <br />$2,000.00 <br />to $25,000.00 <br />to $50,000.00 <br />to $100,000.00 <br />to $500,000.00 <br />to <br />State Surcharge as require <br />Demolition <br />Demolition: Principal structure <br />Demolition: Accessory structure/Septic sy e <br />(Per unit fee) <br />City Engineer may require an erosion control <br />escrow for projects disturbing soils. <br />$83.50 for the first $2,000.00 plus $1'M <br />including $25,000.00 <br />$464.15 for the first $25,000.00 <br />including $50,000.00 <br />$764.15 for the firs 000.00 plu <br />including $100,000 <br />for each <br />fraction thereof, to and including <br />I � or fraction thereof, to and <br />or fraction thereof, to and <br />1$1,000.00, or fraction thereof, to and <br />the first $100, plus $6.7 ach additional $1,000.00, or fraction thereof, to <br />$500,000.00 <br />L$500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to <br />the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof <br />$100.00 <br />$50.00 <br />Not to Exceed <br />$1,000.00 <br />4of19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.