My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-2025 - Agenda Packet Cc - Work Session
Orono
>
City Council
>
2025
>
11-10-2025 - Agenda Packet Cc - Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 5:01:13 PM
Creation date
11/7/2025 5:00:51 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Work Session
Document Date
11/10/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit D. Utility Rates and Fees <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing water and wastewater utility services to <br />new customers to avoid placing these costs on existing customers. The connection fee includes those portions of existing assets that will benefit new customers together <br />with any anticipated future capital improvements constructed for the purpose of providing utility services to new customers. The connection charge applies to those <br />properties not previously assessed for the associated utility project. <br />Fee <br />MUNICIPAL CONNECTION PERMIT <br />Sewer (Includes one inspection) <br />$150.00 <br />SAC (Sewer Availability Charge) (MCES) <br />$2,485.00 <br />Water (Includes one inspection) <br />$150.00 <br />Horn <br />Quote Basis <br />Additional Connection inspection (Water or Sewer) <br />$100.00 <br />Additional Disconnection inspection (Water or Sewer) <br />$100.00 <br />POINT OF SALE SEWER SERVICE INFLOW & INFILTRATION INSPECTION FEES <br />Residential - City Inspection .00 <br />Residential - Private Inspection Review .00 <br />Commercial 50.00 <br />Non -Compliance Surcharge (90 days after inspection) th <br />SEWER PROJECTS <br />Connection to existing City Sewer System: $6,000 per unit <br />Connection to City Sewer in areas still within their assessment window (less than 15 years sincjprtsed) shall pay a <br />ant - int nli is intaract that ra iHAnrac ,mares rharaarl at tha times of than art• <br />Fee <br />$ 0.00 <br />$ 0 <br />2010 North Farm Road <br />2014 Green Trees <br />2015 Green Trees Extension <br />$ 2 , <br />Connection to Sewer System in adjacent <br />to Long Lake Sewer System <br />WATER CONNECTIONS <br />Connection to existing <br />*or 20% over adjacent <br />Current Fee per Adjad <br />to LgIll11111rWater System <br />to <br />WATER METER AND HORN <br />5/8"(3/4"x7-1/2") meter <br />3/4" (3/4"x9") meter with ho <br />1" meter with horn including <br />Larger meter <br />of <br />Vr <br />Fee <br />er current L ake Feeule <br />ayzSchedata Fee Schedule <br />$4,370 per unit <br />Fee <br />or per current Long Lake Fee Schedule <br />) or per current Wavzata Fee Schedule <br />ling sales tax Actual Cost <br />sales tax Actual Cost <br />Actual Cost <br />Actual Cost <br />Applicable Code or MN State <br />Statute (MSS) Number <br />to the <br />8of19 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.