My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-1984 Council Packet
Orono
>
City Council
>
1984
>
11-13-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 1:18:35 PM
Creation date
10/30/2025 1:12:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permits issued by the Minnesota Pollution Control Agency which govern <br />resolution of the Twin Cities combined sewer overflow problem. <br />WHO WILL BENEFIT FROM THE SEPARATION PROGRAM? <br />Separating the combined sewer pipes to end the practice of dumping raw <br />sewage in the Mississippi River will help ameliorate a public health threat <br />Posed by the fecal coliform and viruses that now enter the river via overflow <br />Outlets. What groups of people will benefit? Everyone along and downstream of <br />the current out£alls: river users of all types, the three directly affected <br />cities, the public and states downstream from the Twin Cities. Minnesota as a <br />whole will. benefit. Its greatest river will be cleaner and more esthetic. <br />Solving the combined sewer overflow problem removes a threat of state or <br />federa. sanctions or court -dictated answers that might be doubly expensive or <br />impact the natural suburban growth and development of the Twin Cities Area. <br />STEPS THAT !TEED TO BE TAKEN <br />Combined sewer overflow in the Metropolitan Area and inadequate wastewater <br />treatment are two important water, quality problems remaining in the state. <br />There has not been enough federal and state funding to solve those problems on <br />an accelerated timetable. <br />1. The 1985 legislature needs to fund adequately the independent state <br />construction grants program that was established by the 1984 legislature. The <br />program must include combined sewer overflow projects as grant -eligible. <br />2. The Congress needs to pass a new Clean Water Act that provides an <br />appropriate federal share of the cost of further water quality improvements. <br />These actions will, in turn, provide the neceszary financing so the sewer <br />separation program can be carried out rapidly and outstate communities can get <br />on with improving their water quality. <br />3. Minneapolis, St. Paul, and South St. Paul need to complete their <br />planning for sewer separations, which is currently under way. <br />4. The Metropolitan Council needs to amend its Water Resources Management <br />Development Guide to include the separation projects. The changes are scheduled <br />for ear_'y 1985. The Council also needs to give an earlier -than -planned go ahead <br />to three regional sewer interceptor projects that planned as part of the <br />sewer separation solution. Estimated cost of the r�dional interceptors is about <br />$20 million. <br />draft Oct 12 <br />KR222A POEDTI <br />
The URL can be used to link to this page
Your browser does not support the video tag.