My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-1984 Council Packet
Orono
>
City Council
>
1984
>
11-13-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 1:18:35 PM
Creation date
10/30/2025 1:12:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b) Upon completion of the plans and outline specifications and <br />approval thereof by the City Council, five sets of the plans and <br />specifications shall be delivered to the Developer who shall <br />thereafter bid and/or contract with a City -approved, State - <br />licensed plumbing contractor to install the complete system with <br />said Developer's assuming the complete cost thereof, including <br />without limitation all excavation, backfill, electrical <br />connections, restoration, septic tank pumping and abandonment, <br />street opening, tapping, barricades, street restoration and other <br />items necessary for a complete operating system. <br />c) The City shall obtain all required Pollution Control Agency and <br />Metropolitan Waste Control Commission sewer extension permits. <br />The City shall not be liable for failure to obtain the permits. <br />d) The Developer's licensed contractor shall obtain from the City two <br />sewer connection permits for the two existing residences at 2470 <br />and 2480 Carman Street, which combined permits shall constitute the <br />only City permit required to install the proposed system to and <br />including connection of the existing residences. A third <br />connection permit shall be required whenever anew house is built on <br />the third vacant lot. <br />e) The undersigned owner shall pay to the City all required permit, <br />connection and sewer availability charges prior to issuance of the <br />construction permits, as follows: <br />kJDRESS: 2470 (exist.) <br />Permit Fee $ 20.50 <br />MWCC/SAC $425.00 <br />Navarre Connection $375.00 <br />Unit <br />2474 (future) <br />deferred <br />deferred <br />deferred <br />2480 (exist.) <br />$ 20. 50 <br />$425.00 <br />$375.00 <br />$820.50 <br />deferred <br />$820.50 <br />f) Upon payments to the City <br />of the amounts due to the City under the <br />agreement, the City shall <br />reimburse the Developers upon completion <br />and approval of the project by the City, in an <br />amount equal to the <br />estimated cost of providing pumps for gravity sewer <br />service to each <br />property consistent with <br />past City sewer projects, as follows: <br />ADDRESS: <br />2470 <br />2474 <br />2480 <br />Amount to <br />be paid $3,500 <br />$3,500 <br />$3,500 <br />by City <br />to Developer <br />In addition, the City <br />shall pay the City's <br />Engineer costs, <br />estimated to be S900 for <br />each of the units. <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.