Laserfiche WebLink
1290010911.7 <br />i . The meta o sewer 1 i r,e was on gi na.) I y constructed by the <br />City of Orono. The sewer project (LS-6�:-1) was assessed and <br />Constructed in 1S633 prior to the adoption of Orono's <br />Comprehensive Sewer Plan and Comprehensive City Wide Zoning. <br />2. The property is already served by an existing sewer <br />service stub. Connection will not involve extensi , of <br />existing metro line. <br />3. Unit capacity is available within the MWCC line. <br />4. The property waF, assessed for lateral sewer. <br />g. The residence on the levelopod lot wi+hin the proposed <br />subdivision is served by sewer. <br />6. The maXimum number of seWf-�r Units for the property does <br />not exceed the ma;: i mum number of residential units allowed <br />on the property based on t' minimum rural residential <br />density of 1 onit per 2 acres of dry buildable area. <br />7. Zoning will remain rural and all development will Occur <br />in strict conformance with the rura) district requirements <br />including use, lot size, setbacks and all pertinent rural <br />performance standards. <br />8. The property could sustain an on -site septic system i+ <br />required. <br />FURTHERMORE, BE IT RESOLVED that based upon the above* <br />findings the Orono City Council hereb-J direct: its Mayor and City <br />Clerk to execute the MWCC connection permit application and upon <br />COunci 1 "s approval of the final plat of breck:ezr.ridge further <br />direct: the City Clerk to transmit the ex, ecuted permit <br />application to the Metro Waste Control Commission. <br />Page or <br />