Laserfiche WebLink
Project: Navarre Force Main 6 Lift <br />Station #7 San. S. <br />Payment No:� <br />1 <br />Orono, Minnesota <br />File No: 13923 <br />Contractor: B b D Contracting <br />Date: Oct. 22, <br />1984 <br />STATEMENT OF WORK <br />Unit <br />Est'd Quantity <br />Amount <br />Contract Item <br />Unit Price <br />Quantity To Date <br />To Date <br />PART I - FORCE MAIN <br />6" DIP force main <br />L.F. <br />$24.37 <br />1,278 <br />1,278 <br />$31,144.86 <br />Standard 4' diam. air release <br />manhole w/1642B cstg. <br />Ea. <br />1,746.22 <br />1 <br />1 <br />1,746.22 <br />Cut 6" DIP into existing manholes <br />Ea. <br />1,250.00 <br />1 <br />1 <br />1,250.00 <br />Jack or auger 6" DIP P.d. <br />L.F. <br />77.50 <br />170 <br />170 <br />13,175.00 <br />Cut 6"DIP into existing 6" force main <br />Ea. <br />1,725.00 <br />1 <br />1 <br />1,725.00 <br />C.I. fittings <br />Lbs. <br />1.18 <br />600 <br />600 <br />708.00 <br />Mechanical trench compaction <br />L.F. <br />1.25 <br />1,278 <br />1,278 <br />1,597.50 <br />Common excavation <br />C.Y. <br />2.98 <br />750 <br />50 <br />149.00 <br />Class 5 aggregate base <br />T. <br />7.38 <br />1,090 <br />200 <br />1,476.00 <br />AC-1 bitum. material for mixture <br />T. <br />210.00 <br />20 <br />2331 bitum. base course mixture <br />T. <br />19.95 <br />250 <br />2341 bitum. wearing course mixture <br />T. <br />22.90 <br />120 <br />Bituminous curb (Type "B") <br />L.F. <br />5.25 <br />450 <br />Remove bituminous surfacing <br />S.Y. <br />5.25 <br />1,250 <br />800 <br />4,200.00 <br />Remove 6 replace CB or MH cstg. <br />Ea. <br />1,875.00 <br />2 <br />2 <br />3,750.00 <br />Cross under existing water main <br />Ea. <br />445.00 <br />2 <br />2 <br />890.00 <br />Cross existing water service <br />Ea. <br />450.00 <br />2 <br />2 <br />900.00 <br />Sod w/3" topsoil <br />S.Y. <br />4.50 <br />1,2U0 <br />TOTAL <br />FART I - FORCE <br />MAIN..... <br />$62,711.58 <br />Page 1. <br />3826c <br />