My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-2025 Agenda Packet Cc - Regular Meeting
Orono
>
City Council
>
2025
>
10-13-2025 Agenda Packet Cc - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 7:46:39 AM
Creation date
10/23/2025 9:01:20 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Regular Meeting
Document Date
10/13/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: October 13, 2025 <br />Title: Repair Lift Station Pumps and Control Panels <br />Presenter: DJ Goman, Public Works Superintendent <br />Section: Consent Agenda <br />Item: 12 <br />Purpose: <br />The purpose of this action item is to gain approval to proceed with the Lift Station Pump Repairs <br />for 2025. <br />2. Background: <br />The Sewer Department has developed a maintenance plan for the 47 lift/grinder stations that are <br />part of the sewer system. As part of the plan, each station is inspected annually by both our own <br />city utility staff and an outside qualified contractor to identify routine maintenance needs. The <br />attachment identifies the lift stations that were found needing attention including the the type of <br />work recommended at each location, some of the work is warranty. <br />3. Scope: <br />Lift Stations 2, 25, 29, and 31, and Grinder Stations 10 and 12 were identified as needing <br />immediate repairs. While other listed were moved to capital replacements for the future. The <br />repairs include removing the identified worn out or bad components and the installation of new <br />parts or pumps, labor and testing after repairs are completed. <br />The repairs range from full pump replacements, to fixing worn outs components in the pumps and <br />controls. Examples include bearings, seals, wear rings, impellors, electrical relays and starters. <br />This is done to extend the life span of the assets. <br />4. Cost: <br />The Quote listed below was for $53,130.00 from Quality Flow Systems Inc. <br />Company <br />Description <br />Cost <br />Quality Flow Systems Inc. <br />Parts, Labor and Installation, Testing <br />$53,130.00 <br />Funding: <br />This project will be funded through the Sewer Operating Fund. <br />6. Staff Recommendation: <br />I recommend acceptance of the quote provided by Quality Flow Systems, Inc, which includes <br />parts, labor, installation and testing for $53,130.00 <br />COUNCIL ACTION REQUESTED <br />Motion to approve in the amount of $53,130.00 from Quality Flow Systems Inc. <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.