My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4105 Bayside Road - 06-117-23-14-0023
>
Land Use
>
89-1475, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 11:04:53 AM
Creation date
10/21/2025 10:59:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^F1 KATYDID LANE -.21 <br />ST. V 1, CHAE _, V N 55537 ,, i <br />497.356-1 n-4. • 'c.� <br />Steven 3. Schirmear <br />October 26, 1989 <br />John McDowell <br />Tract A, RLS 748, Lot a Sayside ridge <br />Parcel 1, Fast Site Sub -Div. <br />Orono, Henn. Co., MN <br />This system is Designed for a Type 1, four bedroom hone and in accordance <br />with the Minnesota Pollution Control Agency Chapter 7080 and local <br />ordinances. <br />The soils on this site are typical of SCS soils mapped - KkC2 - Kilkenny <br />clay loam. A seasonally high water table was located at 14", :6", <br />18", 6 22", (mottled soil). Due to the seasonally high water table, <br />a pressurized mound system will need to be installed. ;he bottom of <br />the rock bed must be located at least 3' above the seasonally high <br />water table. <br />The soils at a depth of 18" have a percolation rate averaging 27.5 <br />min/inch and are adequate for treating septic effluent. <br />A pumping chamber will need to be installed to lift the effluent to tho <br />treatment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and :;and fill material are clean. :he sod layer below the <br />entire mounded area must be turned over, just break up the soc, be sure <br />not to over work. <br />The power supply and switches must be located outside t::e manhole and <br />pumping chamber in a weather proof enclosure. A warning device must be <br />installed with a light and sound device, ;.`.is is in case of a pump failure. <br />(Mercury floats are a good method). <br />All neighboring wells are located more than 1GG' away from t o rroposed <br />treatment area. <br />Keep all heavy equipment off of the proposed treotT.ent area -fore and <br />after-onstruction as much as possible. Tne treat. -.en*_ area should be <br />marked off before construction. <br />173N : <br />Soil and Percolation Tazta <br />Srp(it Srslrm 1)e4egn <br />
The URL can be used to link to this page
Your browser does not support the video tag.