Laserfiche WebLink
Windjammer LaneLake Minnetonka#LICENSE NO.DATES1SEPTEMBER 17, 2025Phone (952) 474-7964Web: www.advsur.comCLIENT NAME / JOB ADDRESSSHEET TITLESHEET NO.SHEET 1 OF 1DRAWING NUMBER# 42379Thomas M. BloomSHEET SIZELEGAL DESCRIPTION:Lot 6, Block 1, PIRATES COVE, Hennepin County, Minnesota.SCOPE OF WORK & LIMITATIONS:1.Showing the length and direction of boundary lines of the legal description listed above. The scope of our servicesdoes not include determining what you own, which is a legal matter. Please check the legal description with yourrecords or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters ofrecord, such as easements, that you wish to be included on the survey have been shown.2.Showing the location of observed existing improvements we deem necessary for the survey.3.Setting survey markers or verifying existing survey markers to establish the corners of the property.4.This survey has been completed without the benefit of a current title commitment. There may be existingeasements or other encumbrances that would be revealed by a current title commitment. Therefore, this surveydoes not purport to show any easements or encumbrances other than the ones shown hereon.5.Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding andor stucco of the building.6.Showing elevations on the site at selected locations to give some indication of the topography of the site. We havealso provided a benchmark for your use in determining elevations for construction on this site. The elevationsshown relate only to the benchmark provided on this survey. Use that benchmark and check at least one otherfeature shown on the survey when determining other elevations for use on this site or before beginningconstruction.7.While we show a proposed location for this home or addition, we are not as familiar with your proposed plans asyou, your architect, or the builder are. Review our proposed location of the improvements and proposed yardgrades carefully to verify that they match your plans before construction begins. Also, we are not as familiar withlocal codes and minimum requirements as the local building and zoning officials in this community are. Be sure toshow this survey to said officials, or any other officials that may have jurisdiction over the proposed improvementsand obtain their approvals before beginning construction or planning improvements to the property.STANDARD SYMBOLS & CONVENTIONS:"●" Denotes iron survey marker, set, unless otherwise noted.18202 Minnetonka Boulevard, Suite 401Deephaven, Minnesota 55391GRADING & EROSION CONTROL NOTES:BEFORE DEMOLITION AND GRADING BEGIN·Install silt fence/bio roll around the perimeter of the construction area.·Sediment control measures must remain in place until final stabilization has beenestablished and then shall be removed. Sediment controls may be removed toaccommodate short term construction activity but must be replaced before the nextrain.·Inlet protection for all storm sewer inlets downstream of the site within one blockor as directed by the City. Inlet protection shall also be provided on all proposedstorm sewer inlets immediately following construction of the inlet. Inlet protectionmust be installed in a manner that will not impound water for extended periods oftime or in a manner that presents a hazard to vehicular or pedestrian traffic.DURING CONSTRUCTION:·Soil compaction shall be minimized; areas of compacted soil will be removed orloosened via tilling to a depth of no less than 6-inches.·When dirt stockpiles have been created, a double row of silt fence shall be placed toprevent escape of sediment laden runoff and if the piles or other disturbed areas areto remain in place for more than 14 days, they shall be seeded with MinnesotaDepartment of Transportation Seed Mixture 22-111 at 100 lb/acre followed bycovering with spray mulch.·A dumpster shall be placed on the site for prompt disposal of construction debris.These dumpsters shall be serviced regularly to prevent overflowing and blowingonto adjacent properties. Disposal of solid wastes from the site shall in accordancewith Minnesota Pollution Control Agency requirements.·Site shall be kept clean at all times and refuse properly controlled.·A separate container shall be placed for disposal of hazardous waste. Hazardouswastes shall be disposed of in accordance with MPCA requirements.·No concrete washout shall occur on site unless it is done with an approvedMinnesota Pollution Control Agency (MPCA) device or standard.·The contractor shall inspect on a weekly basis and after any rainfall greaterthan 1” all erosion control devices and make any repairs immediately. Aninspection log shall be kept on site detailing these inspections and repairspreformed.·The street will be swept clean before the end of each day of active construction,when sediment is tracked into the street.·If necessary, vehicles, that have mud on their wheels, shall be cleaned beforeexiting the site in the rock entrance areas·Moisture shall be applied to disturbed areas to control dust as needed.·Portable toilet facilities shall be placed on site for use by workers and shall beproperly maintained.·Temporary pumping shall not be permitted without the use of an approvedMinnesota Pollution Control Agency (MPCA) device or standard.·All exposed soil areas will be stabilized as soon as practical. Unworked soils thatremain exposed and not in use for longer than 14 days will be covered withtemporary seed (grass, oats, or wheat)·Temporary erosion control shall be installed no later than 14 days after the site isfirst disturbed and shall consist of broadcast seeding with Minnesota Department ofTransportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spraymulch.·Areas with slopes greater than 3 to 1 and areas next to wetlands/waterbodies gradedor exposed during construction shall be protected with temporary vegetation,mulching or other means as soon as practical.·Erosion control measures shown on the erosion control plan are the absoluteminimum. The contractor shall install temporary earth dikes, sediment traps orbasins and additional silt fencing as deemed necessary to control erosion.SITE WORK COMPLETION:·When final grading has been completed but before placement of seed or sod an “asbuilt” survey shall be done per City of Orono requirements to insure that gradingwas properly done.·When any remedial grading has been completed, sod or seeding shall be completedincluding any erosion control blankets for steep areas.·When turf is established, silt fence and inlet protection and other erosion controldevices shall be disposed of and adjacent streets, alleys and walks shall be cleanedas needed to deliver a site that is erosion resistant and clean.·Contractor shall maintain positive drainage of a minimum 2% slope away fromproposed building.SURVEYED DATE:DRAFTED DATE:APRIL 15, 2025SEPTEMBER 17, 2025DRAWING ORIENTATION & SCALE40'20'01 INCH = 20 FEET2275 foot setback