Laserfiche WebLink
CITY of ORONO <br />a _ Pust O(nee e„s ss.Crr.ad B.y. M�nne.ou WM* Munida.1 Omtt. <br />• • • On the North Shore of Lake MinnetonAa <br />August 31, 1984 <br />Mr. Lowell Thompson <br />Director Environmental Planninq_ <br />Metropolitan Council <br />300 Metro Square Building <br />St. Paul, Minnesota 55101 <br />Deer Mr. Thompson: <br />Regarding our telephone conversation concerning the proposed Maple <br />Plain interceptor, I wish to submit the following comments. <br />The concerns of the City of Orono are the changes from the preliminary <br />design to the final design increasing the force main size from 10" to <br />12" and the increase in flows as follows: <br />design average daily flow <br />peak design flow <br />peak flow factor <br />Preliminary <br />Design <br />9.385 M.G.D. <br />1.35 M.G.D. <br />3.5 <br />Final <br />Design <br />0.493 M.G.D. <br />2.43 M.G.D. <br />6.9 <br />After considerable review this spring, the City of Orono reluctantly <br />withdrew from the public hearing process challenging the proposed <br />construction of the Maple Plain interceptor through rural Orono, based <br />upon s 10" force main and the preliminary design flows, which could not <br />provide urban ser•.ices in our rural area according to the City of Orono <br />Community Management Plan. <br />I understan� that the Metropolitan Systems Committee will be meeting <br />on September 10th and that this item will be on that agenda. <br />I would appreciate the Systems Committee review of this matter if it is <br />convenient to do so on the 10th. <br />N1LL00`4 A 10 &p-O)73$7 a "a MMMATW"a flna.'Kr -Py t)aa • KILK waaaa ASUAWe, <br />