If a sanitary sewer project is constructed it is required <br />that you connect to the sewer main within 16 months after <br />completion of the project. The following are costs that will be <br />incurred by each resident connecting to the sewer mainline. <br />Individual connection cost, approximately . . . . s1,000.00 <br />SAC (Sewer availibitly charge) required by <br />Metropolitan Wast Control Commission, <br />must be paid before connection . . . . . . . . . . 425.06 <br />Permit fee (to City) . . . . . . . . . . . . . . . . . 30.30 <br />Utility service billing <br />(to City - starts after connection) per quarter 42.90 <br />