My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-1984 Council Packet
Orono
>
City Council
>
1984
>
09-10-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 12:49:26 PM
Creation date
10/20/2025 12:39:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br />CITY of ORONO <br />I5.1 Ufne. I4.a W-c"ual lint, Mmn...1. 5532.1• M.niNn.l ofay.. <br />• • On the No,th Sho,r of Lake Minnetonka <br />August 21, 1984 <br />Ms. Martha A. Allan <br />Ass ant Referral Coordinator <br />Met, .. politan Council <br />300 Metro Square Building <br />Seventh and Robert Streets <br />St. Paul, Minnesota 55101 <br />Dear Ms. Allan, <br />The City of Orono is in receipt of your August 13th letter concerning <br />plans and specitications for the Maple Plain Interceptor. <br />Please be advised that the City Engineer Mr. Glenn Cook, Bonestroo, <br />Rosene, Anderlik and Associates has been advised by Mr. Timothy F. <br />Keegan, Staff Engineer Metropolitan waste Control Commission that <br />plans and specifications will not be available until the week of August <br />27th. <br />The City requests that the one week review period be extended to <br />accommodate receiving the plans and specs at than time. <br />The immediate concern of the City of Orono is the apparent change from <br />the preliminary design to the final design increasing the force main <br />size from 10" to 12" and the increase in design flows as follows: <br />Preliminary Final <br />Design Design_ <br />design average daily flow 0.305 M.G.D. 6.403 M.G.D. <br />Peak design flow 1.35 M.G.D. 2.43 M.G.D. <br />peak flow factor 3.5 6.0 <br />Our understanding from the outset of out discussionr and final <br />agreements were the preliminary design factors as outlined. <br />fhe City of Orono would appreciate your comments concerning the <br />Metropolitan Council review. <br />/Sincerely, <br />A`a Ater <br />City Xdaink5trator <br />ccl O Pck de Vr its, Metropolitan Council Dist iict i3 <br />Timothy Keegan, Metropolitan waste Control Commission <br />John Harrington, Metropolitan Council <br />Clenn Cook, Ronestroo, Rasene, Anderlik and Associates <br />atil"I'1In\I\I. •)11))1 • nI1V l\IS IIIn 11U]111\e\ll •II IHr • Yl It e'.U.11 .?I I"I <br />
The URL can be used to link to this page
Your browser does not support the video tag.