My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IN <br />r <br />SECTION 11 <br />CHANGES IN THE WORK <br />11.1 CHANGE ORDERS <br />Without invalidating the Agreement, Owner may, at any time or from time to <br />time, order additions, deletions or revisions in the Work; these will be au- <br />thorized by Change Orders. Upon receipt of a Change Order, Contractor shall <br />proceed with the Work involved. All such Work shall be executed under the <br />applicable conditions of the Contract Documents. If any Change Order causes <br />an increase or decrease in the Contract Price or an extension or shortening of <br />the Contract time, an equitable adjustment will be made as provided in Section <br />11 or Section 12 on the basis of a claim made by either party. <br />11.2 MINOR CHANGES <br />Engineer may authorize minor charges in the Work not involving an adjustment <br />in the Contract Price or the Contract Time, which are consistent with the <br />overall intent of the Contract Documents. These may be accomplished by a <br />Field Order and shall be binding on Owner, and also on Contractor who shall <br />perform the change jromptly. If Contractor believes that a Field Order justi- <br />fies an increase in the Contract Price or Contract Time, Contractor may make a <br />claim therefor as provided in this Section 11. <br />11.3 UNAUTHORIZED WORK <br />Additional Work performed without authorization of a Change Order will not en- <br />title Contractor to an increase in the Contract Price or an extension of the <br />Contract Time, except in the case of an emergency. <br />11.4 ENGINEER RECOMMENDATIONS <br />Owner shall execute appropriate Change Orders prepared by Engineer covering <br />changes in the Work which are required by Owner, or required because of un- <br />foreseen physical conditions or emergenci-s, or because of uncovering Work <br />found not to be defective, or because of any other claim of Contractor for a <br />change in the Contract Time or the Contract Price which is recommended by En- <br />gineer. <br />11.5 NOTICE OF CHANGE TO SURETY <br />If notice of any change affecting the general scope of the Work or change in <br />the Contrac Price is required by the provisions of any Bond to he given to <br />the Suretv, it will be Contra�to.'a responsibility to so notify the Surety, <br />and the amount of each applicable 'fond shall be adjusted accordingly. Con- <br />tractor shall furnish proof of sucn adjustment to Owner. <br />3595a - 37 <br />4/R1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.