My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upon completion the patch shall be smooth, neat and approximately 1/8" <br />to 1/4" above the level of the adjacent bituminous surface. <br />2800.4. METHOD OF MEASUP,EMENT: <br />2800.4.1. Gravel Base: The gravel base shall be measured by weight on a scale <br />provided by the Contractor. <br />2800.4.2 Bituminous Mixture: The bituminous mixture for patching will be mea- <br />sured by weight. Loads shall be weighed on approved scales furnished by the Con- <br />tractor. <br />2800.5. LASIS OF PAYMENT: Payment for the patching mixture at the contract <br />price per ton shall be compensation in full for all costs incidental to the <br />placement of the patching mixtures including removal and disposal cf the un- <br />suitable materials, prime materials and all bituminous materials incorporated <br />in the mixture. <br />Where gravel base is required payment shall be made for the gravel at the <br />contract unit price per ton. <br />Payment for patching will bra macae on ctic i,asis r the following schedule: <br />ITEM NO. ITFN UNIT <br />2800.501 Bituminous Mixture for Patching Ton <br />2800.502 Gravel Base in Place Ton <br />2 800 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.