My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
3960 Bayside Road - 05-117-23-22-0016
>
3960 Bayside Rd - 05-117-23-22-0007
>
Land Use
>
00-2563, SKPLAN
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 1:30:54 PM
Creation date
10/16/2025 1:30:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 I< f'/,-l. P/ 0(,/4,V <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE £R,E Ll1\4INARY APPLICATION <br />1. Payment of fees (refer to "application fees" listed below. <br />2. Completed application form . <br />3. Preliminary plat information on Certificate of Survey. <br />4. Certified Property Owners List of owners within 350' (you must obtain this list from Hennepin County Department of Finance A-603 <br />Govt. Center 348-3271). <br />5. As an addendum to this a <br />Zoning Official's Signature_' =f7J'l,'!''-L\---'7---c--b4-/,,'"""""'ho,"""'"=--===----- <br />I <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE FINAL APPLICATION <br />1. Payment of fees (refer to Preliminary Subdivision Approval resolution and park fees if applicable). <br />2. Signed Certificate of Survey or mylar copies of formal plat. <br />3 . Title opinion. <br />4. Easements , covenants, etc. <br />5. Developers Agreement and Letter of Credit. <br />Zoning Official's Signature___________________ Date __ ~------------ <br />I. APPLICATION FEES (Zoning Administrator to check [X] those which apply) <br />A. i _pplication Base Fees: -----4-Sketch Plan Review (Class I, II & III) $250.00 <br />___ . Subdivision of a Lot Line Rearrangement $350.00 <br />Subdivision Application (Class I & II) $350 .00 <br />Preliminary Subdivision Application $375 .00 + $25 .00/lot (Class III & all non-residential) <br />___ Final Plat Application (Class III) $200.00 <br />___ Legal Review and Filing : <br />___ Subdivision only $75.00 <br />___ Subdivision w/easements and covenants min . $200.00 <br />___ Park Fees (to be determined per Section 11.62) <br />___ Legal and Engineering Review Fees (as incurred) <br />___ Renewal of Class I and II Subdivision Application $200.00 (No change from original application) <br />-. __ Renewal of Class III, Preliminary Subdivision Application $200.00 (No change from original application) <br />___ Renewal of Final Class III Subd ivision Application $150 .00 (No change from original application) <br />B. Special Improvement Fees: <br />___ Proposed Private Roads $600 .00 + $.SO /lineal ft .; ___ !in. ft. x .50 = $ __ _ <br />___ Proposed Public Roads $900 .00 + $.SO /lineal ft .; ___ !in . ft. x .50 = $ __ _ <br />___ Request for City to Accept_§xisting Private Road $900.00 <br />___ Proposed Sanitary Sewer Main Extension $250 .00 + $25 /stub <br />___ Proposed Watermain Extension $250 .00 + $25 /stub <br />___ Proposed Storm Sewer System (excluding culverts) $200 .00 <br />On-Site System, Site Evaluation Rev iew (applicable to rural subdivision applications) <br />$50.00/per lot x ___ new lots <br />C. Flexible Application Fees/Misc. Fees <br />___ Variance $220 .00 ($50.00 per each additional variance) <br />Easement Vacation Associated with Subdivision $100 .00 <br />PRD Application with Subdivision $30 .00/Dwelling Unit <br />The applicant hereby agrees to provide all information required or requested by the Zoning Administrator, City Engineer, City Attorney , <br />Planning Commission and Council necessary to procf SS this application and further agrees to pay all additio~al fees established by <br />ordinance . '-1rl/l t , _ /) /) -1 ·A~ :)_, / { / / C, D <br />Applicant's Signatu re I I {,AJ(?Vl~ ._:J.L/?O /t . Date ______ ~-------- <br />Owner's Signature JYu ·eJioJ-1 J d.JrL ~ Date ~/ / / J -0 U <br />Applicant must have all submittals into the City Office 25 days before the Planning Commission meeting. Planning Commission meetings <br />are held on the third Monday of each month . Applicants must be present at all scheduled review meetings of the Planning Commission <br />and Council. If an applicant is unable to attend a scheduled meeting , please make arrangements to have an authorized agent attend in your <br />place and to advise the Building & Zoning Office of this change prior to the meeting. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.