My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4860
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4800 - 4899 (May 13, 2002 - November 25, 2002)
>
Resolution 4860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 2:01:07 PM
Creation date
11/13/2015 2:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� ,t <br /> � O� ' <br /> • O , O <br /> � .^ C ITY of ORONO <br /> r'� � ` `br.. � <br /> ,�,,� , , G,�ti <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��kESII�4� � NO. � � � � <br /> 5) Parking lot construction plans, including confirmation that pazking <br /> lots and driving lanes will be paved and provided with concrete <br /> curb and gutter; and that all driving lanes within parking lots shall <br /> have a 9-ton minimum pavement section. A geotechnical evaluation <br /> of the soil shall be done in conjunction with the pavement design <br /> and shall be submitted to the City Engineer for approval. <br /> 6) Detailed signage and lighting plans. <br /> 7) Any additional plans and specifications deemed necessary by the <br /> City as review progresses. <br /> D. Development Agreement. Development Approval is contingent upon the <br /> successful execution of a Development Agreement between the applicant <br /> . � and the City. Such Agreement shall address all specific City requirements � <br /> • for the development. � � <br /> E. Financial Guarantee. The Development� Agreement shall include a <br /> financial guarantee by the applicant to ensure the completion of site <br /> improvements. The City Engineer shall complete an estimate of <br /> improvement costs, including but not limited to landscaping, grading, <br /> erosion control, utilities, driveways and parking areas, trails, sidewalks, <br /> retaining walls and stormwater management facility construction, and the <br /> � applicant shall provide to the City a financial guazantee of 150% of the <br /> improvement costs. <br /> F. Storm Water and Drainage Trunk Fee. The standard Storm Water and <br /> . Drainage Trunk Fee for commercial development shall be paid by the <br /> developer at the rate of$6,480 per acre (2002 Fee Schedule). The City <br /> • Council shall determine prior to final Development Plan approval whether <br /> the Developer will be charged additional fees for off-site stormwater <br /> improvements that benefit this property. The Storm Water and Drainage <br /> Trunk Fee shall not be charged for the acreage within the Adjacent Parcel <br /> that is to be developed to serve the property; said Fee for the acreage in � <br /> the Adjacent Parcel shall be charged at the time the Adjacent Parcel is <br /> developed. � <br /> � <br /> ' Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.