My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4852
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4800 - 4899 (May 13, 2002 - November 25, 2002)
>
Resolution 4852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 1:58:05 PM
Creation date
11/13/2015 1:58:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, � <br /> � O� <br /> O O <br /> • � g r CITY of ORONO <br /> � .�.. � <br /> -,; . � <br /> . ��� �Gti <br /> RESOLUTION OF THE CITY COUNCIL <br /> �kESI3�'� � NO. � � � � <br /> ii) Final grading, drainage and erosion control plan showing existing <br /> and proposed contours, building locations, elevations; stormwater <br /> facilities and calculations, utilities and erosion control measures <br /> to be used during construction. Development Plan Approval will <br /> not be granted until the Minnehaha Creek Watershed District and <br />� MnDOT have approved the stormwater plans. <br /> iii) Final landscaping design plan with planting schedules including <br /> numbers and species, in accordance with the landscaping <br /> requirements of the RPUD zoning district. <br /> iv) Final building construction plans, including: <br /> v) Detailed signage and lighting plans. <br /> � � vi) Phasing Plan <br /> � <br /> vii) Any additional plans and specifications deemed necessary <br /> by the City as review progresses. <br /> H. Platting Process. Applicant shall complete all requirements for Final Plat <br /> Approval as outlined in a forthcoming Preliminary Plat Approval <br /> Resolution. <br /> I. Development Agreement. Development Approval is contingent upon the <br /> successful execution of a Development Agreement between the applicant <br /> and the City. Such Agreement shall address all specific City requirements <br /> for the development. , ' <br /> J. Financial Guarantee. The Development Agreement shall include a <br /> financial guarantee by the applicant to ensure the completion of site <br /> improvements. The City Engineer shall complete an estimate of <br /> improvement costs, including but not limited to public and private streets, <br /> curb & gutter, stormsewer, landscaping, grading, erosion control, utilities, � <br /> driveways and parking areas, trails, sidewalks, retaining walls and <br /> stormwater management facility construction, and the applicant shall <br /> provide to the City a financial guarantee of 150% of the improvement <br /> • costs. <br /> Page 18 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.