Laserfiche WebLink
FILE # LA19-000084 <br />November 18, 2019 <br />Page 3 of 4 <br /> <br />Road/ Cul de sac length. Baldur Park Road is currently approximately 990 feet from its’ <br />intersection with Birch Lane. The maximum length permitted by code is 1000 feet. Baldur <br />Park Road currently ends without a turn-around or cul de sac. The proposed extension of <br />Baldur Park will lengthen the road about 400 feet to approximately 1390 feet. Staff <br />supports this deviation from the length as a cul de sac benefits the public and there are no <br />other options to reduce the length of the cul de sac. <br /> <br />Currently, Baldur Park Road is a 18’ wide road within a 30 foot wide right of way. The <br />proposal shows a 18 feet wide paved surface within a 20’ right of way. Both are deviations <br />from the code requirements of 24’ wide pavement within a 50’ right of way. Staff can <br />support a deviation, but to the existing standards of Baldur Park. The Council seemed to <br />confirm this deviation last fall. <br /> <br />It appears that the road is proposed above the base flood elevation of 931.5, though further <br />detail will be necessary. <br /> <br />Stormwater and Drainage Improvements & Fees. Stormwater plans have not been <br />developed at this stage. Stormwater will need to be managed as required by the Watershed <br />District. <br /> <br />The project will be subject to the Stormwater and Drainage Trunk Fee (SW&DT Fee). <br />Final calculation of the fee would be based on the final lot count. If, for example the <br />development results in 2 lots at 0.5 acres, the SW&DT Fee would be $6,050 per new lot as <br />outlined in the 2019 Orono Fee Schedule. <br /> <br />Utility Locations/Availability/Assessments/Connection Fees. The lots will need to connect <br />to sanitary sewer, the sanitary sewer line will need to be extended at the applicant’s <br />expense. A SAC connection fee will be required at the time of connection. Extension of <br />the sewer will be the responsibility of the developer. <br /> <br />Municipal Water does not serve the property. A well will need to be developed for each <br />lot. <br />It is assumed that all other utilities will be underground and located within easements and <br />right of way. This will be verified with the review of the utility plan and supports the need <br />for additional right of way. <br /> <br />Wetlands. It appears that a portion of the western shore is impacted by wetlands. The <br />MCWD will likely require a buffer of some width, which may impact access and building <br />sites. Wetland buffers may be included in lot area calculations, but not the wetlands <br />themselves. The proposal does include an averaged wetland buffer, to be approved by the <br />watershed district. <br /> <br />Tree and/or Woodland Impacts. The site plan indicates several large cottonwood trees on <br />the property, many of which will be removed to accommodate construction. <br /> <br />Conservation Design. This project will trigger the need for a conservation design, due to