My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
3445 Bayside Road
>
Land Use
>
80-589, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2025 12:42:25 PM
Creation date
10/14/2025 12:37:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITE' or OR()N() <br />IIt-x Iih*Crvs1aI ka%. %Iinneseitit 55.12.39MumcipaI (Wict-. <br />I Lakv .tifr►lnrlortka <br />k Mr. uic.K Peterson <br />{ Best and Flanagan <br />4040 IDS Center <br />Minneapolis, MN 55402 <br />Re: McCleary Subdivi.son, Bayside Road <br />Dear Mr. Peterson. <br />As per our phone conversation of May 19, I am listing the <br />items which the City of Orono would like addressed as part <br />of a homeowners agreement or ether legal arrangement regarding <br />the on -site sewaqe treatment systems for the McCleary property: <br />1. Ownership of the system and the property it occupies. <br />2. Responsibility :and schedule for maintenance of each <br />individual property's system. <br />3. Responsibility for repair or <br />failure occur. <br />replacement should <br />4. 'Method or mode of construction of mound systems) <br />should development on individual lots be non -concurrent. <br />Some general comments: <br />Each house will have a holding tank for toilet. waste <br />(and possibly garbage grind(ar waste); and two seti_tic tanks <br />with a pump tank; all located on each individual lot. Each <br />house will also be connected to a separate graywater mound <br />system located on the commoi property. The agreements, then, <br />should discuss the construction, maintenance, operation, and <br />repair of the individual (yet adjacent) mound systems on the <br />common property. i believe our main concerns are, in the case <br />that one of the graywater systems fails to function correctly, <br />how does it affect the other systems, who is responsible for <br />the problem, who will repair .it, who is responsible for damage <br />to the adjacent systems if they are disturbed during repairs <br />to one system, etc. c�tc. Also, protection of the graywater <br />mound systems should br, di:3CUSsed; i.e. No traffic is allowed <br />on them; grass cover must .3e maintained; kids can't use them <br />as a sandbox etc. etc. <br />BUILIANGAZOM"ttC 471•-157 • ADMINISfAM10%A FI\AVCF. - 471735M • YI BLIC wUkKS 473-7159 <br />1551•SSI\(, <br />
The URL can be used to link to this page
Your browser does not support the video tag.