Laserfiche WebLink
SHEET D-1513 <br />(New Sheet) <br />UNARCO-ROHN <br />Anril 1, 1979 <br />INSTALLATION INSTRUCTIONS <br />BX SELF-SUPPORTING CYLINDER 9ASES <br />1. Assemble the base as shown on Drawing C750409. <br />2. Piace the cylinder in the area the tower is to occupy. (Note: Be sure to <br />position the bay;e so that the tower can be hinge.' in The direction where there <br />are no obstructions.) `dark off a circle approximately 2 to 3 inches larger than <br />the cylinder. <br />3. Dig a hole 4 feet deep (deep enough to ccmpletely bury the cylinder below ground <br />level). <br />4. Drop the cylinder in the hole and with it as vertical as possible throw the soil <br />back into the cylinder and around it, tamp!ng it solid after every 6 to 8 inches <br />of fill. (Note: 9e sure cylinder is flush or below the ground surface. See <br />Drawing C750409.) <br />5. When the cylinder is approximately one-half full of dirt, attach the base tower <br />section to the pipe sleeves of the base as shown on Drawing C750409. This is <br />necessary to avoid distortion of the cylinder as you continue to fill and tamp <br />the soil In the base. <br />6. Continue to fill and tamp the soil into the cylinder to within 6 inches of the <br />top. <br />7. Plumb the tower section by placing a level on the outside of each leg adjusting <br />to the plumb position by loosening and re-alioning the BXC81 angle support <br />brackets until the tower is dumb. (Note? The brackets must be extremely <br />tight when the tower section is plumb.) <br />8. Remove the top 1/2" x 3-1/2" bolts Dn the pivot side of the tower that holds <br />the pipe sleeves to the yokes. Then remove both bolts on the side opposite the <br />pivot direction. The section can now be hinged to the ground. <br />9. Assemble the rest of the tower as per BX tower instructions. Hinge the tower <br />up and when vertical put the 1/2" x 3-1/2" bolts back through the yokes and <br />pipe sleeves. Then tighten all base bolts securely. <br />10. Complete filling the cylinder with dirt and tamp firmly. <br />11. After installation is completed, the base should be rechecked in about 30 days <br />to be sure that the hardware remains tight and it should be rechecked every six <br />months. <br />12. Towers installed in sand or gravel should be guyed or bracketed. <br />NOTES ..... <br />Do not install towers near power Ines. All towers should be installed out of <br />falling distance of power lines since every electrical and telephone wire should be <br />considered dangerous. <br />Unarco-Rohn recommends anti -climb sections on all towers to prevent unauthorized <br />persons from climbing towers. <br />All antenna installations must be grounded per local or natlonal codes. <br />All towers should be installed by experienced and trained personnel. <br />All types of antenna installations should be thoroughly inspected by qualified <br />personnel at least twice a year and remarked with hazard and warning labels to if, - <br />sure safety and proper performance. <br />