My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-06-28 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
E
>
East Long Lake Road
>
550 East Long Lake Road - 35-118-23-14-0002
>
Septic
>
1993-06-28 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 3:13:34 PM
Creation date
10/9/2025 3:01:45 PM
Metadata
Fields
Template:
x Address Old
House Number
550
Street Name
East Long Lake
Street Type
Road
Address
550 East Long Lake Road
PIN
3511823140002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DESIGN WORKSHEET <br />(For Flows up to 1200 gpd) <br />A. FLOW <br />Estimated ' r, r) gpd (seepages D-7 or I-3, 4, 5) <br />or measured _ gpd x 1.5 = - <br />B. SEPTIC TANK LIQUID VOLUMES <br />a _ 0 gallons (see pages C-3 or r-5) <br />C. SOILS (refer to site evaluation) <br />1. Depth to restricting layer = _Z_ -t inches <br />2. Depth of percolation tests = inches <br />3. Percolation rate mpi <br />4. Land slope - % <br />D. ROCK LAYER DIMENSIONS <br />I. Multiply flow rate by 0.83 to obtain required area of rock <br />layer: Daily Flow x 0.83 = <br />y gpd x 0.83 sq. ft. / gpd =) y 2 sq. f t 4 : - <br />2. Select width of rock layer (10 feet or less) _ /% ft. <br />3. Length of rock layer = Area + Width = <br />`, a ► sq. ft. + I_ ft. = <K D _ ft. <br />E. ROCK VOLUME <br />1. Multiply rock area by rock depth to get cubic feet of rock; <br />?H-) sq. ft. xi � ft. cu. ft. <br />2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards; <br />1.uLtj cu. ft. + 27 = Q -7_ cu. yd. <br />3. Multiply cubic yards by 1.4 to get weight of rock in tons; <br />cu. yd. x 1.4 ton/cu. yd. = y I tons. <br />F. ADSORPTION WIDTH CL_A" tv;+ - <br />1. Percolation rate in top 12 inches of soil is mpi <br />2. Select allowable soil loading rate from table on page E-; <br />I q, - gpd / f t2 <br />3. Calculate adsorption width ratio by dividing rock layer <br />loading rate of 1.20 gpd/ft2 by allowable soil loading rate; <br />1.20gpd /ft2+ .L-) 5 gpd <br />/ft2= <br />Check this value on page E-16. <br />4. Multiply adsorption width ratio by rock layer width to get <br />required adsorption width; <br />2 -�x i ft = ft <br />Eatialmed Sewage Flows itr Gallons Per day <br />(gpd)of <br />n.e.. �.,] <br />Ty 1 <br />Type II <br />Type III <br />T�pe <br />Rock Bed <br />•t•I•I•/ hJ•I•IN.WP7•I•� I <br />dth S10 R. <br />•=- Length <br />Absorption Width Sizing Table <br />rwcoto iae ltare <br />in Min" M pa <br />Inch IMYI) <br />Sal Teature <br />lowktr» <br />per day per <br />urge (am <br />I Ratio of <br />Akaorpion rkkh <br />to Rock LAM <br />W11111h <br />F34W than 0.1 <br />corms Sand <br />0.1105 <br />Sand <br />1 "0 <br />1.00 <br />0.1 a S •• <br />Sand •• <br />0.60 <br />2.n0 <br />6.. IS <br />andFmc <br />Sy Loun <br />0.79 <br />1.52 <br />16 to .10 <br />Loom <br />0.60 <br />2.00 <br />31 to45 <br />Sill Loam <br />0.50 <br />2.40 <br />36 to 60 <br />Clay Loam <br />0.45 <br />2.67 <br />60 to 120 <br />Clay <br />0.24 <br />SAW <br />Slower than <br />Clay <br />----- <br />..... <br />120••• <br />
The URL can be used to link to this page
Your browser does not support the video tag.