Laserfiche WebLink
C44) 0 <br /> ':4-t ke- CITY of ORONO <br /> Z714 <br /> �� 1p iVir %�,, �� RESOLUTION OF THE CITY COUNCIL <br /> l4 � ) 1 4� NO. 483 <br /> kES8_ <br /> 3. Renewal of a Conditional Use Permit for the grading on the property and construction of the <br /> stormwater management pond. (Section 10.03, Subdivisions 19-21). <br /> NOW, THEREFORE, BE IT RESOLVED by the City Council of Orono, <br /> Minnesota: <br /> FINDINGS <br /> 1. This application was reviewed as Zoning File #02-2776. <br /> 2. The property has been used as a County Highway maintenance facility since at least <br /> 1962, the time the original building was constructed. In 1962 the zoning of the <br /> property was for commercial purposes, since the property was rezoned to LR-1C. <br /> Because the use of the property has not changed since the rezoning, the facility has <br /> been allowed to exist as a legal non-conforming use. The facility is used primarily <br /> for winter road maintenance,with a coverage area for this facility from County Road <br /> 15 between Mound and Highway 12, County Road 19 from Orono to Excelsior. <br /> 3. The Planning Commission reviewed this application and recommended approval of <br /> the renewal application subject to the following conditions: <br /> A. The pond shall be installed prior to any occupancy of the salt/sand storage <br /> building. <br /> B. All runoff from the site shall be directed to the pond for treatment. <br /> C. All debris and material located in the wetlands on the property shall be <br /> removed prior to occupancy of the building. <br /> w <br /> D. All conditions of Resolution No. 4485, as adopted by the City Council on <br /> June 26, 2000, shall be conditions of the renewal application. <br /> 4. County Staff has indicated the proposed building would actually be less intense than <br /> the use that exists because the number of salt/sand deliveries will be reduced by 60 <br /> trips annually and the salt/sand mix and storage would be relocated indoors. During <br /> a significant snow event, night deliveries of dry salt and sand mix are required <br /> Page 2 of 7 <br />